1576 Joseph, Joseph W., Hamby, Theresa M. Phase I Archaeological Survey of the Proposed Roxboro Road Widening

New South Associates conducted a Phase I Archaeological Survey of the proposed Roxboro Road widening in DeKalb County, Georgia on May 21, 1997.

DeKalb 1997
1592 Hamby, Theresa M., Wheaton, Thomas R. Phase I Archaeology and Historic Architectural Surveys of the Proposed Cherokee Expansion Project Facilities Gwinnett, Walton, Barrow, and Coweta Counties, Georgia

New South Associates conducted Phase I archaeological and historic architectural surveys of work space locations along the North Georgia Extension replacement of the Transcontinental gas pipeline January 28, 1997.

Barrow 1997
1598 Joseph, Joseph W., Hamby, Theresa M. Phase I Archaeological Survey of the Proposed Spring Place Bypass

Between November 28 and December 1, 1995, New South Associates conducted a Phase I archaeological survey of the six mile corridor of the proposed Spring Place Bypass, located in Murray County.

Murray 1995
1604 Joseph, Joseph W., Hamby, Theresa M. Phase I Archaeological Survey of the Proposed Widening and Realignment of Hazelbrand Road and Improvements to SR 142

New South Associates conducted a Phase I archaeological survey of the proposed realignment and widening of Hazelbrand Road and the improvements to SR 142 on January 22, 1997. The Hazelbrand Road project corridor is approximately 5,000 feet long with a 100 foot right-of-way.

Newton 1997
1627 Joseph, Joseph W., Hamby, Theresa M. Addendum to the Phase I Archaeological Survey for the I-85 Cd, SR 120/Boggs Road. Nh-im-85-2 (62), P.I. No. 110231

New South Associates conducted a Phase I archaeological survey of the 1 service road in Gwinnett County on February 25, 1997.

Gwinnett 1997
1646 Hamby, Theresa M. Phase I Archaeological Survey of the Proposed Sigman Road Widening, Rockdale County, Georgia

New South Associates conducted a Phase I archeological survey of the proposed Sigman Road widening in Rockdale County from May 10 through May 12, 1994. The project area contains approximately seven miles of road widening, much of it lying in or near the original right-of-way.

Rockdale 1994
1648 Reed, Mary Elizabeth, Hamby, Theresa M. Phase I Archaeological Survey of I-85/SR 316 Interchange Improvements and SR 316 Auxiliary Lanes

New South Associates conducted a Phase I archaeological survey of the proposed I-85/SR 316 interchange improvements and SR 316 Auxiliary Lanes on July 11 and 12, 1995. The project corridor is approximately 4 miles in length with a maximum right-of-way of 250 feet.

Gwinnett 1995
1653 Raymer, Leslie E., Hamby, Theresa M. Phase I Archaeological Survey of Haddock Road, Camden County, Georgia

New South Associates conducted a Phase I archaeological survey of Haddock Road in Camden County between July 2 and 3, 1997. The survey corridor is approximately 2 miles long with an 80 foot right-of-way, 40 feet on either side of the centerline.

Camden 1997
1668 Rhodes, Cynthia Gass, Hamby, Theresa M. A Phase I Archaeological Survey of Bloomfield Drive Macon, Bibb County, Georgia

On September 16 - 17, 1997 New South Associates conducted a Phase I archaeological survey for the widening and improvements to Bloomfield Drive, Macon, Bibb County.

Bibb 1997
1672 Hamby, Theresa M. Phase I Archaeological Survey of the Clinton Road Widening

New South Associates conducted a Phase I archaeological survey of the proposed Clinton Road widening, Bibb County, Georgia on December 18, 1997. The survey of the approximately 1.3 mile corridor consisted of widening of existing alignment, in an urban setting.

Bibb 1997