1676
|
Rhodes, Cynthia Gass, Hamby, Theresa M.
|
A Phase I Archaeological Survey of Hartley Bridge Road
|
On September 16-17, 1997 New South Associates conducted a Phase I archaeological survey for the widening and improvements to Hartley Bridge Road, Macon, Bibb County, Georgia. The project corridor is located from Mount Pleasant Church Road to Houston Road, excluding the section of interchange.
|
Bibb
|
1998
|
1677
|
Hamby, Theresa M.
|
Phase I Archaeological Survey of the Northside Drive Widening
|
New South Associates conducted a Phase I archaeological survey of the proposed Northside Drive widening, Bibb County, Georgia on March 19, 1998. The survey of the approximately 1.2 mile corridor consisted of widening of existing alignment, in a suburban neighborhood.
|
Bibb
|
1998
|
1681
|
Rhodes, Cynthia Gass, Hamby, Theresa M.
|
Phase I Archaeological Survey for the Proposed Dogwood Drive Extension
|
On April 15, 1998, New South Associates conducted a Phase I archaeological survey for the proposed extension of Dogwood Drive, Rockdale County, Georgia.
|
Rockdale
|
1998
|
1683
|
Hamby, Theresa M.
|
Phase I Archaeological Survey of the Williamson Road/Brownley Drive Widening
|
New South Associates conducted a Phase I archaeological survey of the proposed Williamson Road/Brownley Drive widening, Bibb County, Georgia on March 19 and 20, 1998. The survey of the approximately 2.4 mile corridor consisted of widening of existing alignment.
|
Bibb
|
1998
|
1691
|
Joseph, Joseph W., Hamby, Theresa M.
|
Phase I Archaeological Survey of the Relocation of the SR18 and SR354 Intersection
|
New South Associates conducted a Phase I archaeological survey of proposed SR 18 and SR 354 Intersection Relocation in Harris County, February 28, 1996. An additional 304.8 m (1,000 ft.) were surveyed on March 18, 1997. The project area is located southwest of the city of Pine Mountain.
|
Harris
|
1997
|
1697
|
Joseph, Joseph W., Hamby, Theresa M.
|
Phase I Archaeological Survey for the Proposed West Cobb Loop Alternate D Realignment, Cobb County, Georgia
|
On October 2 and 3, 1997 New South Associates conducted a Phase I Archaeological survey of the proposed West Cobb Loop, specifically Alternate D, in Cobb County, Georgia. New South Associates previously conducted a survey of is of Alternate D in 1993 (Wheaton et al.
|
Cobb
|
1997
|
1827
|
Reed, Mary Elizabeth, Hamby, Theresa M.
|
Phase I Archeological Survey of the Northbound Ramp from I-75 at Barrett Parkway GDOT Project NH-75-3(234)
|
On June 24, 1998, New South Associates conducted a Phase I archaeological survey of the approximately 488 meters (1,600 feet) of Northbound Ramp at Interstate 75 and Barrett Parkway in Cobb County, Georgia.
|
Cobb
|
1998
|
1829
|
Hamby, Theresa M.
|
Phase I Archeological Survey of the Forest Hill Road Widening
|
New South Associates conducted a Phase I archaeological survey of the proposed Forest Hill Road widening, Bibb County, Georgia on March 19 and 20, 1998. The survey of the approximately 2.5 mile corridor consisted of widening of existing alignment.
|
Bibb
|
1998
|
1846
|
Hamby, Theresa M.
|
Phase I Archaeological Survey of the Proposed Improvements to Log Cabin Road/Bloomfield Road
|
New South Associates conducted a Phase I Archaeological Survey of the proposed improvements to Log Cabin Road/Bloomfield Road, Bibb County, Georgia. The survey of the approximately 2.82 mile corridor was conducted on January 3 and 4, 1996.
|
Bibb
|
1998
|
1849
|
Hamby, Theresa M.
|
Phase I Archaeological Survey of the Northwest Parkway, Bibb County, Georgia
|
New South Associates conducted a Phase I archaeological survey of the proposed Northwest Parkway, Bibb County, Georgia on August 4, 1998. The survey of the approximately 2.1 mile corridor consisted of a combination of new alignment and improvement of the existing alignment.
|
Bibb
|
1998
|