1498
|
Joseph, Joseph W., Hamby, Theresa M.
|
Phase I Archaeological Survey of Sugarloaf Parkway Extension Gwinnett County, Georgia
|
New South Associates conducted a Phase I archaeological survey of the proposed Sugarloaf Parkway Extension on December 7, 1994. The project corridor is approximately 1.124 miles in length and consists of approximately 3,400 feet of new alignment and 2,000 feet of road widening.
|
Gwinnett
|
1996
|
1505
|
Joseph, Joseph W., Hamby, Theresa M.
|
Phase I Archaeological Survey of the Proposed Improvements to Houston Road, Bibb County
|
New South Associates conducted a Phase I Archaeological Survey of the proposed improvements to Houston Road, Bibb County, Georgia. The survey of the approximately 3.20 mile corridor was conducted on January 4 and 5, 1996.
|
Bibb
|
1996
|
1509
|
Hamby, Theresa M., Wheaton, Thomas R.
|
Phase I Archeological Survey of the Southeast Rome Bypass
|
New South Associates conducted a Phase I Archeological Survey of the Rome SE Bypass on June 11 and 15, 1992. The proposed corridor is new alignment, and extends from S. R. 101 to U. S. 411. The corridor is 3.5 miles in length with a minimum 250 foot wide right-of-way.
|
Floyd
|
1992
|
1527
|
Joseph, Joseph W., Hamby, Theresa M.
|
Phase I Archaeological Survey of Three Rural Roads in Camden County
|
New South Associates conducted a Phase I archaeological survey of three roads in Camden County between June 25 and June 28, 1996. The survey corridors include 1.6 miles of Old Jefferson Road, 0.6 miles of Woodard Road (A), and 0.6 hires of 3-R Fish Camp Road totaling 2.8 miles.
|
Camden
|
1996
|
1532
|
Reed, Mary Elizabeth, Hamby, Theresa M.
|
Phase I Archaeological Survey of North Brown Road Relocation
|
New South Associates conducted a Phase I archaeological survey of the proposed North Brown Road relocation on May 16, 1995. The project corridor is approximately 1.3 miles in length with 0.8 miles of new alignment and 0.5 miles of existing road widening. The right-of-way is 125 feet wide.
|
Gwinnett
|
1995
|
1535
|
Joseph, Joseph W., Hamby, Theresa M.
|
Phase I Archaeological Survey of Mitchell Bridge Road, Whitfield and Murray Counties, Georgia
|
On October 24 and 25, 1995, New South Associates conducted a Phase I archaeological survey of approximately 0.75 mile of new alignment, road widening and a bridge replacement for Mitchell Bridge Road. The study corridor crosses from Whitfield into Murray County, Georgia.
|
Murray
|
1995
|
1537
|
Hamby, Theresa M.
|
Phase I Archaeological Survey of Three Proposed Intersection Improvements to Martin Luther King Jr. Drive
|
New South Associates conducted a Phase I Archaeological Survey of three proposed intersection improvements to Martin Luther King, Jr. Drive in the City of Atlanta, Fulton County, Georgia.
|
Fulton
|
1996
|
1545
|
Hamby, Theresa M.
|
Phase I Archaeological Survey of the Proposed Arbor Place Mall and Assessment of Site 9Do72
|
New South Associates conducted a Phase I archaeological survey of approximately 125 acres in Douglas County on October 1, 1996. The study utilized extensive ground surface exposure throughout the study area and discovered no new archaeological sites.
|
Douglas
|
1996
|
1550
|
Reed, Mary Elizabeth, Hamby, Theresa M.
|
Phase I Archaeological Survey of the State Route 20 Widening and Relocation, Gwinnett County, Georgia
|
New South Associates conducted a Phase I archaeological survey of the proposed State Route 20 widening and relocation on April 2 and 5, 1996.
|
Gwinnett
|
1996
|
1568
|
Hamby, Theresa M.
|
Phase I Archaeological Survey of Proposed Improvements to the SR92 and Jimmy Mayfield Road Intersection, Fayette County, Georgia
|
New South Associates conducted a Phase I archaeological survey of proposed improvements to the SR 92 and Jimmy Mayfield Intersection in Fayette County on December 4, 1996. A pedestrian survey, combining surface inspection with 30 meter interval shovel testing was conducted.
|
Fayette
|
1996
|