Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
11400 Entorf, Robert F. Archaeological Assessment of Project BRF-090-2(19), Treutlen County

Alligator: Triple 8’ x 4’ culvert with no additional right of way. Pendleton: Add triple 9’ x 7’ culver at existing double 9’ x 7’ culvert, remove bridge and add 24’ CD with no additional right of way on site detour at these sites.

Treutlen County, GA 1989
11401 Perrine, Wesley A. Phase I Archaeological Survey for Bridge Maintenance Activities on State Route 12 over Snapfinger Creek in DeKalb County, Georgia

The purpose of this project is for bridge maintenance activities on Structure # 089-0016-0, State Route (SR) 12/Covington Highway over Snapfinger Creek in DeKalb County, Georgia.

DeKalb County, GA 2018
11402 Paglione, Teresa L. Archaeological Assessment of Project BRZLB-237(8), Putnam County

Existing structure is 20 ft x 39 ft of timber, steel, and concrete. Project begins 300’ west of stream and ends 300’ east of stream. New structure is a triple 9’ x 9’ x 50’ concrete bridge culvert. No additional right of way will be required.

Putnam County, GA 1990
11403 Entorf, Robert F. Archaeological Assessment of Project BRSLB-2015(1), Troup County

240’ x 32’ bridge. No Wetland involvement, no historic materials, no archaeological materials, no displacements.

Troup County, GA 1987
11404 Rotenstein, David S. Archaeological Assessment of Project BRZLB-221(7), Oglethorpe County

Existing structure is a 16 ft. x 60 ft. all timber bridge. There is no existing right of way. Project begins 200 ft. south of stream and ends 700 ft. north of stream. New structure will be a triple 9'x8'. concrete bridge culvert. Required right of way will be 100 ft. total.

Oglethorpe County, GA 1986
11405 Rotenstein, David S. Archaeological Assessment of Project BRS-2796(3), Troup County

160’ x 44’ bridge. No displacements, no public water intakes, no archaeological resources, no wetland involvement.

Troup County, GA 1986
11406 Rotenstein, David S. Archaeological Assessment of Project BRZLB-285(5), Troup County

100’ x 36’ bridge. No wetland involvement, no displacements, no archaeological materials, no public water intakes.

Troup County, GA 1986
11407 Entorf, Robert F. Archaeological Assessment of Project BRF-066-1(22), Twiggs County

320’ x 44’ bridge to replace the 2 existing bridges at shellstone creek and shellstone creek over flow and a single barrel; 9’ x 8’ box culvert to replace the existing bridge at shell stone tributary.

Twiggs County, GA 1988
11408 Paglione, Teresa L. Archaeological Assessment of Project BRF-155-1(6), Taylor County

Bridge 1: 500 x 44, Bridge 2: 700 x 44, Bridge 3: 700 x 44, Bridge 4: 1101 x 44. No historic archaeological materials, no historic materials, some wetland involvement.

Taylor County, GA 1990
11409 Rotenstein, David S. Archaeological Assessment of Project BHF-050-2(20), Stephens County

Existing concrete and steel bridge 43.6 x 24. Drainage area. Widen existing bridge to 44; no additional right of way required. Widening to be symmetrical about the existing bridge. No detour required. Road to remain open during construction.

Stephens County, GA 1986