11426 Entorf, Robert F. Archaeological Assessment of Project BRF-018-1(47), Paulding County

Begin approximately 500 feet south of creek and end approximately 500 feet north of creek. Replace with a 290’ x 44’ concrete bridge. 20 feet of right of way required. Detour to be constructed east of existing bridge.

Paulding 1988
11427 Rotenstein, David S. Archaeological Assessment of Project BRS-0731(2), Bulloch County

220 long and 24 wide. Bridge and approaches, 40’ wide concrete bridge, 20’ additional right of way. No archaeological materials, some wetland involvement.

Bulloch 1985
11428 Paglione, Teresa L. Archaeological Assessment of Project BRSLB-1832(2), Bleckley County

Begins approximately 200 ft west of creek and ends approximately 200 feet east of creek. Bridge structure will be a triple 7’ x 7’ bridge culvert on road will be closed during construction.

Bleckley 1990
11429 Lyon, Elizabeth A., Paglione, Teresa L. Archaeological Assessment of Revised Project FR-008-1(31), Glynn County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, Project FR-008-1(31), Glynn County, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP)

Glynn 1991
11430 Paglione, Teresa L. Archaeological Assessment of Project BRZLB-293(8), Upson County

200’ x 40’ bridge; road will be closed during construction. No significant archaeological materials, no wetland involvement.

Upson 1991
11431 Rotenstein, David S. Archaeological Assessment of Project BHF-034-2(20), Berrien County

Prepared 800’ x 40’ concrete bridge; the existing structure will be widened 8’ on each side. No additional right of way will be needed. Traffic will be maintained during construction.

Berrien 1985
11432 Paglione, Teresa L. Archaeological Assessment of Project BF-029-1(28), Macon County

25.2'X 60' bridge with timber pilings and a concrete deck. Approaches have 24' paving with 7' shoulders. Existing right-of-way is approximately 100'. Replace bridge on existing alignment with a triple 9'x 9' concrete bridge culvert. Reconstruct approaches to provide 24' paving and 10' shoulders.

Macon 1993
11433 Blackwelder, Jon R., Williams, Siska Addendum to the Phase I Archaeological Survey for the Proposed Uptown Pine Lake Improvements (Phase II) - Rockbridge Road, DeKalb County, Georgia

P.I. 0008121 has been designed to match the typical section of this segment of Rockbridge Road (Allgood Road to Rowland Road) with the typical section of the larger widening project, GDOT P.I. 0008401 (SR 10/Memorial Drive to Stone-Mountain/Lithonia Road).

DeKalb 2018
11434 Quirk, Phillip W., Bowen, Neil J., Webb, Robert S. Phase I Cultural Resources Survey, Two Proposed Stream Crossings, Harrison Poultry Tract, Taliaferro County, Georgia

On December 6, 2018, R.S. Webb & Associates conducted a cultural resources literature review and a Phase I cultural resources survey of areas surrounding two proposed stream crossings within the Harrison Poultry tract in Taliaferro County, Georgia.

Taliaferro 2018
11435 Wettstaed, James R. CULTURAL RESOURCE INVESTIGATIONS FOR THE UPPER WEST ARMUCHEE CREEK PROJECT, CONASAUGA RANGER DISTRICT, CHATTAHOOCHEE-OCONEE NATIONAL FORESTS, CHATTOOGA, WALKER, AND WHITFIELD COUNTIES, GEORGIA

The Conasauga Ranger District of the Chattahoochee-Oconee National Forests is preparing an Environmental Assessment for the proposed Upper West Armuchee Creek Project (UWAC). This project involves a range of activities, including timber harvest and prescribed burning.

Chattooga 2015