Report Number Author(s) Title Abstract Summary County Year
11410 Rotenstein, David S. Archaeological Assessment of Project BRZLB-257(6), Stephens County

Culvert on new alignment approximately 15’ downstream proposed 93 ft. concrete box culvert. Edge of existing road is existing r/w. Road to be closed during construction.

Stephens County, GA 1986
11411 Rotenstein, David S. Archaeological Assessment of Project PR-262-1(257), Stephens County

Flatten existing horizontal curve at culvert site. Alignment shifted approximately 10’ downstream. Single concrete box culvert.

Stephens County, GA 1986
11412 Paglione, Teresa L. Archaeological Assessment of Project BRF-131-1(6), Seminole County

200’ x 40’ concrete bridge constructed on existing alignment. No additional right of way will be needed. A detour bridge will be constructed on the south side of the existing bridge.

Seminole County, GA 1990
11413 Paglione, Teresa L. Archaeological Assessment of Project BRS-0722(13), Screven County

105' x 23.7' concrete and steel bridge with wood piles. Existing right-of-way is 100 feet. Replacement structure would be a triple 9' x 8' x 56' concrete bridge culvert. total required right-of- way would vary from 100 feet to 160 feet.

Screven County, GA 1993
11414 Entorf, Robert F. Archaeological Assessment of Project BRSLB-0754(6), Spalding County

Bridge: 100’ x 38’ bridge. No wetland involvement, no displacements, no significant archaeological materials.

Spalding County, GA 1988
11415 Rotenstein, David S. Archaeological Assessment of Project BRS-0578(3), Treutlen County

Project will begin approximately 600 ft. west of stream and will end approximately 600 ft. east of stream. New structure is estimated to be 40 ft. x 200 ft. bridge. A temporary detour easement 30 ft. x 300 ft. will be required on downstream side.

Treutlen County, GA 1985
11416 Bowen, William R. Archaeological Assessment of Project BHF-180-1(5), Chattooga County

Existing structure is a 24’ x 150’ concrete bridge. Project begins approximately 300’ south of bridge and extends to approximately 350’ north of bridge. Existing bridge would be widened to 44.’ To be constructed under traffic one lane with signals. No additional right of way required.

Chattooga County, GA 1986
11417 Entorf, Robert F. Archaeological Assessment of Project BRZLB-055(13), Chattooga County

Begins approximately 350’ west of structure and ends approximately 140’ east of structure. New structure 57 feet of double 10’ x 5’ concrete bridge culvert. New alignment 28’ upstream. Required right of way 60’ to 100.’

Chattooga County, GA 1987
11418 Entorf, Robert F. Archaeological Assessment of Project BHF-017-3(56), Chattooga County

Existing structure is a 396’x28’ concrete bridge with concrete T beams, 10 spans, and 6” concrete deck. Existing right-of-way 120 feet. Begins 1000’ SE of Chattooga River & ends 1500’ NE of Chattooga River widen exiting bridge to 56’. Maintain traffic by stage construction.

Chattooga County, GA 1989
11419 Jackson, Paul D. A Phase I Cultural Resources Survey for the Proposed South Grady Pipeline Replacement Project, Grady County, Georgia

TerraXplorations, Inc. (TerraX), of Tuscaloosa, Alabama, was contracted by Pond, Inc., of Peachtree Corners, Georgia, to conduct a cultural resources survey for the proposed South Grady Pipeline Project in Grady County, Georgia.

Grady County, GA 2019