11416 Bowen, William R. Archaeological Assessment of Project BHF-180-1(5), Chattooga County

Existing structure is a 24’ x 150’ concrete bridge. Project begins approximately 300’ south of bridge and extends to approximately 350’ north of bridge. Existing bridge would be widened to 44.’ To be constructed under traffic one lane with signals. No additional right of way required.

Chattooga 1986
11417 Entorf, Robert F. Archaeological Assessment of Project BRZLB-055(13), Chattooga County

Begins approximately 350’ west of structure and ends approximately 140’ east of structure. New structure 57 feet of double 10’ x 5’ concrete bridge culvert. New alignment 28’ upstream. Required right of way 60’ to 100.’

Chattooga 1987
11418 Entorf, Robert F. Archaeological Assessment of Project BHF-017-3(56), Chattooga County

Existing structure is a 396’x28’ concrete bridge with concrete T beams, 10 spans, and 6” concrete deck. Existing right-of-way 120 feet. Begins 1000’ SE of Chattooga River & ends 1500’ NE of Chattooga River widen exiting bridge to 56’. Maintain traffic by stage construction.

Chattooga 1989
11419 Jackson, Paul D. A Phase I Cultural Resources Survey for the Proposed South Grady Pipeline Replacement Project, Grady County, Georgia

TerraXplorations, Inc. (TerraX), of Tuscaloosa, Alabama, was contracted by Pond, Inc., of Peachtree Corners, Georgia, to conduct a cultural resources survey for the proposed South Grady Pipeline Project in Grady County, Georgia.

Grady 2019
11420 Paglione, Teresa L. Archaeological Assessment of Project BRZLB-217(17), Newton County

Project begins 400 ft. west of creek and ends 600 ft. east of creek. New structure is a 28 ft. x 100 ft. concrete and steel bridge. Required right of way is 80 ft. Co. Rd. 75 will be closed during construction, no on-site detour proposed.

Newton 1990
11421 Paglione, Teresa L. Archaeological Assessment of Project BRZLB-217(15), Newton County

Existing structure is a 23.7 ft. X 33 ft. wood bridge No right of way exists.

Newton 1990
11422 Entorf, Robert F. Archaeological Assessment of Project BRF-150-1(4), Talbot County

Bridge: 140’ x 44.’ No significant archaeological resources found

Talbot 1989
11423 Paglione, Teresa L. Archaeological Assessment of Project BRZLB-267(5), Tattnall County

Replace bridge on existing location with a 200'x24' concrete bridge to include approaches. Road to be closed during construct ion. No required right-of-way.

Tattnall 1986
11424 Paglione, Teresa L. Archaeological Assessment of Project BRS-0729(5), Tattnal County

Replace existing bridge and approaches with a triple 8' by 6' concrete bridge culvert. No additional R/W required.

Tattnall 1986
11425 Rotenstein, David S. Archaeological Assessment of Project BRS-0577(3), Treutlen County

No significant archaeological materials, some wetland involvement, no public water intakes, no historic materials.

Tattnall 1985