11440 Entorf, Robert F. Archaeological Assessment of Project BRZLB-137(16), Habersham County

Project begins approximately 300 feet south of southern railroad and ends approximately 300 feet north of the southern railroad. The replacement bridge will be 140 feet long and 38 feet wide.

Habersham County, GA 1990
11441 Wright, Andrew Cultural Resource Survey, Proposed Cell Tower Site "Tremont Road," Cordele, GA 31015

In November 2018, Trileaf Corporation (Trileaf) performed a cultural resource survey for a proposed self-supporting lattice telecommunications tower facility to be built on raw land at Tremont Road, Cordele, Crisp County, Georgia (32° 00’ 36.33” N, 83° 40’ 37.95” W).

Crisp County, GA 2018
11442 Rotenstein, David S. Archaeological Assessment of Project BHF-050-2(17), Habersham County

New structure will be 54’ wide and 300’ long, bridge will constructed and traffic will be maintained. No wetland involvement, no archaeological sites, no costa guard permits required.

Habersham County, GA 1986
11443 Entorf, Robert F. Archaeological Assessment of Project BRS-577(1), Laurens County

Project begins 400’ west of stream and end 650’ east of stream. New structure is a 38’ x 200’ concrete bridge. No right of way will be required. No detour is to be constructed on site.

Laurens County, GA 1989
11444 Entorf, Robert F. Archaeological Assessment of Project BRF-070-1(6), Laurens County

Project begins 400 ft. west of stream and ends 800 ft. east of stream. New structure is a triple 9' x 8' concrete bridge culvert. Temporary detour easement will be required on the downstream side (see attachments). Existing structure is a 23.7 ft. x 120ft. timber, steel & concrete bridge.

Laurens County, GA 1988
11445 Bowen, William R. Archaeological Assessment of Project BRZLB-237(7), Putnam County

Project begins approximately 400 ft. south of existing stream and ends approximately 250 ft. north of stream. New structure will be a 28 ft. x 150 ft. (approximately) bridge. Required right of way will be 100 ft. total. See attachment for layout.

Putnam County, GA 1988
11446 Paglione, Teresa L. Archaeological Assessment of Project BRZLB-217(16), Newton County

Project begins 400 ft. west of creek and ends 400 ft. east of creek. New structure is a 4 barrel 10 ft. x 10 ft. x 75 ft. concrete bridge culvert. Required right of way is 80 ft. Co. Rd. 90 will be closed during construction, no on-site detour is proposed.

Newton County, GA 1990
11447 Bowen, William R. Archaeological Assessment of Project BHF-186-1(13), Paulding County

Lick Log Creek: Begin 315’ south of bridge; end 315’ north of bridge. Widen existing bridge to 44’. No right of way required. Grays Mill Creek: Begin 550’ south of bridge; end 315’ north of bridge. Widen existing bridge to 62.8;’ 35’ x 2’ strip of right of way required.

Paulding County, GA 1987
11448 Pappas, Andrew A., Falvey, Lauren W. Addendum to a Phase I archaeological Resources Survey of SR 120/Abbotts Bridge Road From Parsons Road to Primrose Parkway, Fulton County, Georgia.

Since the time of the original 2015 survey the design for PI No. 0012788 has undergone modification.

Fulton County, GA 2018
11449 Paglione, Teresa L. Archaeological Assessment of Project BRZLB-257(8), Stephens County

The existing structure is 37 feet long and 23.4 wide consisting of concrete abutments, steel beams, and a concrete deck. The required structure will consist of 50 feet of triple 9 x 8 box culvert.

Stephens County, GA 1990