Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
13090 Roberts, Joseph Phase I Addendum Archaeological Survey for the Proposed I-85 Interchange Construction, Bridge Replacement, and Roundabout, Troup County, Georgia

Between November 9 and December 4, 2017, Edwards-Pitman Environmental, Inc.

Troup 2018
13091 Keith, Scot J. Phase I Archaeological Survey, Proposed Roundabout Construction for SR 211 at CR 47/Old Hog Mountain Road, Barrow County, Georgia

The Georgia Department of Transportation (GDOT) plans to install a roundabout at the intersection of SR 211 at CR 47/Old Hog Mountain Road (PI No. 0015883) in Barrow County (Attachment 1).

Barrow 2018
13092 Perrine, Wesley A. Addendum Phase I Archaeological Survey for the Replacement of Bridge 159-5010-0 over Pittman Branch for the Low Impact Bridge Program, Jasper County, Georgia

The purpose of this project is to replace a structurally deficient bridge (Structure ID 159-5010-0) carrying Pitts Chapel Road/County Road (CR) 16 over Pittman Branch in Jasper County, Georgia (Figure 1). The existing Right-of-Way (ROW) measures approximately 60 feet from centerline.

Jasper 2018
13093 Deems, Savana, DuBois, Autumn Archaeological Assessment TCNS ID #168584 Proposed 50-foot Utility Pole with Antenna (Overall Height with Appurtenances) Within 10-foot by 10-Foot (3m by 3m) Pole Site 9GAB001695-B Reservoir Road & Reinhardt College Pkwy Canton, Cherokee County, Georgia

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Cherokee 2018
13094 Ball, Kaitlynn, Beazley, Matthew Archaeological Assessment TCNS ID #174202 Proposed 400-Foot Guyed-Type Telecommunications Structure Within A 100-Foot by 100-Foot Lease Area Donalsonville (G8009) Off Three Notch Road Donalsonville, Seminole County, Georgia

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Seminole 2018
13095 Paglione, Teresa L. Archaeological Assessment of Project IR-75(177), Peach and Houston Counties

This survey of a proposed wetland mitigation site included pedestrian survey, shovel testing and testing (for both archaeological and ecological purposes).

Peach
13096 Archaeological Assessment of Project BRZLB-225(3), Peach County

This project is about replacing the new alignment; some wetland involvement, no historic materials involvement, and no wildlife area involvement. No archaeological site found.

Peach
13097 Hart, Barry D. Archaeological Assessment of Project BHF-026-3(34), Pierce County

This is a bridge widening project and is located north of Blackshear on State Route 38 (US 82). Project will consist of widening the existing roadway and bridges over the Alabaha River.

Pierce 1985
13098 Bowen, William R. Archaeological Survey of County Bridge Project BHF-055-1(24), Banks County

Georgia DOT Project # BHF-055-1(24) is an in-place bridge replacement project at Hudson River and Grove Creek at US 441/SR 15 in Banks County, District 1. Because the project is in place, no new areas will be impacted.

Banks
13099 Bowen, William R. Archaeological Survey of County Bridge Project BHS-2893-1, Banks County

Georgia DOT Project # BHS-2893-1 is an in-place bridge replacement project at SR 19 and the Hudson River in Banks County, District 1. Because the project is in place, no new areas will be impacted. Only those areas which have been disturbed by previous bridge construction will be affected.

Banks 1980