Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
13380 Bowen, William R. Archaeological Survey of the Proposed APD-056-2(8), APD Rights of Way Between Hemp and Blairsville, Union and Fannin Counties, GA

In agreement with Dr. Lewis H. Larson, State Archaeologist, and Dr. Elizabeth A.

Union 1981
13381 McCarley, Billy J. Phase I Archaeological Survey of the Proposed New Harvest Telecommunications Facility in Hamilton

Subterranean Consultants (STC) conducted a Phase I archaeological survey of the New Harvest telecommunication facility lease area and access/utility easement on July 21, 2019. The project area is in northern Harris County in Hamilton, Georgia.

Harris 2019
13382 Lowman, Shannon, Beazley, Matthew Proposed 43-Foot Tall Overall Height Pole Structure

Environmental Corporation of America’s (ECA) client, Mobilitie, LLC, is proposing to contruct a pole as described in the following FCC Form 620, New Tower (NT) Submission Packet.

Fulton 2018
13383 Rodriguez, Ana Cultural Resource Survey Proposed Cell Tower Site, Trileaf # 641824/“Jewel” Carnesville, GA

Trileaf Corporation is in the process of completing a NEPA review at the referenced property. Our client proposes to construct a 285-foot self-support communications tower, with an overall height of 310 feet, and associated equipment within a 100-foot by 10-foot (10,000-square-foot) lease area.

Banks 2018
13384 Ball, Kaitlynn, DuBois, Autumn Section 106 Review TCNS ID 175460 Proposed 300-Foot Tall Guyed-Type Telecommunications Structure (320-Foot Overall Height Including Appurtenances)

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Banks 2018
13385 Studstill, David E. Archaeological Assessment of Project BRZLB-257(7), Stephens County

The proposed project was field surveyed for historic properties in compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto. The survey boundary and methodology were established using the GDOTIFHWA Cultural Resources Survey Guidelines.

Stephens 1991
13386 Studstill, David E. Archaeological Assessment of Project BRZLB-257(7), Stephens County

This is a bridge replacement over Rock Creek on CR 43/Silver Shoals Road. The existing 40’ x 27’ bridge will be replaced with 50 feet of 10’ x 9’ box culvert. The existing right of way and the proposed right of way are unknown at this time.

Stephens 1991
13387 Danchetz, Frank L. Special Provisions For Construction Contract: EDS 441-1(14), Habersham County

TO INCREASE SAFETY, ELIMINATE DRIVER CONFUSION, AND REDUCE THE ACCIDENT RATE BY UPGRADING THE RIGHT TURN LANE TO CHERRY HILL ROAD. ALSO, PROVIDE AN ACCELERATION LANE FOR VEHICLES TURNING EAST FROM CHERRY HILL RD. ONTO A DOWNHILL GRADE WITH POOR SIGHT DISTANCE.

Habersham 1988
13388 Hardy, Floyd E. Archaeological Assessment of Project BRZLB-0143(1), Haralson County

24 hours prior to clearing and grubbing of the project corridor at Panther Creek.

Haralson 1979
13389 Hardy, Floyd E. Archaeological Assessment of Project BRZLB-0143(1), Haralson County

Location - Tallapoosa River crossing county Road 141 approximately 2.5 miles east of Tallapoosa, Georgia.

Haralson 1979