Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
13604 Marshall, Beau SR 155/Candler Road Arterial Enhancement (Phase One): Intersection of Candler Road (SR 155) and Glenwood Road (SR 260)

The Phase One project area encompasses the intersection of Candler and Glenwood Roads, 1,000 feet in each direction (from just north of Eastwood Drive to Glenwood Road; from just east of Glenhill Place to just west of Hopper Street on Glenwood Road).

DeKalb County, GA 2005
13605 Erickson, Luke W. Archaeological Survey of Project CSSTP-M002-00(479) Various Counties

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project CSSTP-M002-00(479), Various Counties in District 1, has been surveyed with respect to archeological resources, especially those on or eligible for inclusion in the Nat

Banks County, GA 2003
13606 Gresham, Thomas H. Mitigation Plan for Archeological Site 9TE34, Terrell County, Georgia

Site 9TE34 is a large, multi-component site on a prominent sandy ridge on the southwest side of Kinchafoonee Creek. Late Archaic through Early Mississippian occupations have been documented, and cultural material extends to about 70 cm below surface over most of the site.

Terrell County, GA 1996
13607 Partridge, Colin Phase I Cultural Resources Investigations of the Regional Sewer Conveyance Improvements Corridor Bryan, Effingham, and Chatham Counties, Georgia

Between March 1 and March 10, 2021, Brockington conducted a Phase I cultural resources survey of the Regional Sewer Conveyance Improvements Corridor in Bryan, Chatham, and Effingham counties, Georgia. 

Bryan County, GA 2021
13608 Brown, Leslie H. Project CSNHS-0006-00(401) Fulton, Clayton, and Henry Counties PI No. 0006401

The proposed project would consist of the installation of the GDOT NaviGAtor System at all entrance ramp locations along 1-75 from the Eagles Landing Parkway to the Cleveland Avenue interchange in Henry, Fulton and Clayton Counties (see attached Figures 1A through 1 G).

Fulton County, GA 2006
13609 Kelly, Arthur Randolph Review of a University of Georgia Report entitled “An Archaeological Survey of Structures 1, 2, 3, 33, 51, 58, and 60 Grove River Watershed Jackson and Banks Counties, Georgia”

This report is a review by A.R.

Jackson County, GA 1975
13610 Hally, David J., Fish, Suzanne K. A Preliminary Site Report for Archaeological Salvage Undertaken at 9Ge10

This report is a preliminary site report for the archaeological salvage undertaken at Site 9GE10. Cold Springs, 9Gel0, overlooks the floodplain of the confluence with Town Creek. A gentle slope across the site increases uphill to the east.

Greene County, GA 1983
13611 Joseph, Joseph W. A Phase I Archaeological Survey of a Proposed Trail Corridor, Bryan County, Georgia

New South Associates conducted a Phase I archaeological survey of a proposed Trail corridor in Richmond Hill, Bryan County, Georgia between October 25 and 28, 1999.

Bryan County, GA 1999
13612 King, Frank Report on Archaeological Monitoring During Soil Reconstruction Battlefield Park, Savannah, Georgia

On January 1, 2004, EMC Engineering Inc. and ENT AC were contracted by the City of Savannah, Georgia to remediate all contaminated soils from the future site of Battlefield Park. Soil remediation took place from April to October of 2004.

Chatham County, GA 2007
13613 Webb, Robert S., Bloom, Jonathan A., Gantt, Mary Elizabeth, Styer, Kenneth F. Phase II Testing of Sites 9HY292, 9HY294, 9BS30, 9BS32, 9BS36, And 9BS45 Proposed Tussahaw Creek Reservoir Henry and Butts Counties, Georgia

During the period of February 11 through 26, 2003, Phase II archeological testing was conducted at Sites 9HY292, 9HY294, 9BS30, 9BS32, 9BS36 and 9BS45 within the proposed Tussahaw Creek Reservoir project area in Henry and Butts Counties, Georgia.

Butts County, GA 2003