Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
14644 Rich, Cori Elise, Horne, Zach Cultural Resources Survey of the POND _FORK – A Telecommunication Project, Gillsville, Hall County, GA Trileaf Project #676105

In April 202 I, Trileaf Corporation (Trileaf) performed a cultural resource inventory survey for a proposed self-support lattice telecommunication tower facility located in Hall County, Gillsville, Georgia (Latitude: 34° 15' 0.48" Longitude: -83° 40' 41.76").

Hall 2021
14645 Amrine, David, Davis, Jera R., Espenshade, Christopher T., Keith, Scot J., Meader, J. Faith Addenendum Phase I Archaeological Survey: SR 9 Bridge Replacement Over the Chestatee River

New South Associates, Inc.

Lumpkin 2021
14646 Chieffo, Anthony PHASE I ARCHAEOLOGICAL SURVEY FOR THE NORTH OCONEE RIVER BRIDGE PROJECT, CLARKE COUNTY, GEORGIA

On May 9, 2018, Edwards-Pitman Environmental, Inc.

Clarke 2019
14647 Hinson, Lindsey PHASE I ARCHAEOLOGICAL SURVEY IN ADVANCE OF THE PROPOSED BRIDGE REPLACEMENT ON SR 25 OVER WAVERLY CREEK AND LITTLE WAVERLY CREEK, CAMDEN COUNTY, GEORGIA

Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for proposed bridge replacements on State Route (SR) 25 over Waverly Creek and Little Waverly Creek (Georgia Department of Transportation [GDOT] P.I. No. 0013739, HP No.

Camden 2020
14648 Mulkey, Mackenzie, Green, William Phase I Archaeological Survey for the Newton County Oak Hill Public Safety Communications Tower Project

On behalf of our client, Terracon Consultants, Inc. (Terracon) conducted an archaeological survey for the proposed Newton County Oak Hill communications site. The fieldwork was performed on January 26, 2022.

Newton 2022
14649 Adams, Natalie P., Valk, Diana, Lockerman, Kristie Phase I Archaeological Survey of 22 Sites and Phase II Archaeological Testing of Site 9RI116 on Fort Gordon

New South Associates conducted a Phase I Archaeological Survey of 22 previously recorded sites and Phase II Testing of 9RI 116 located on Fort Gordon.

Richmond 2008
14650 Trudeau, Mary F., Smith, Alex Phase I Archaeological Survey of Proposed Improvements and Widening of SR 5 from Old Flowers Road, South of McCaysville, Georgia to Copperhill, Tennessee – USACE Section

The Georgia Department of Transportation (GDOT) plans operations and maintenance (O&M) improvements to State Route (SR) 5 from Old Flowers Road at the northern terminus of GDOT P.I. No. 0017038, a separate GDOT project (formerly under P.I. No.

Fannin 2022
14651 LaForge, Travis B., Smith, Alex Addendum Phase I Archaeological Survey for Proposed Intersection Improvements for I-16 at CS 647/CS 2289/Chatham Parkway, Chatham County, Georgia – USACE Section 106 Report (SAS# 2020-00833)

The proposed project would reconfigure the Interstate (I)-16 Eastbound (EB) exit ramp at Chatham Parkway from a two-lane approach to a four-lane approach adding one additional left turn and one additional right 

Chatham 2022
14652 Chance, Elizabeth Second Addendum Phase I Archaeological Survey for the Proposed State Route 20 Improvements Corridor, Cherokee and Forsyth Counties, Georgia.

AECOM Technical Services, Inc.

Cherokee 2022
14653 Pietak, Lynn Marie PHASE I ARCHAEOLOGICAL SURVEY FOR THE PROPOSED BRIDGE REPLACEMENT ON THE I-20 FRONTAGE ROAD OVER THE YELLOW RIVER, NEWTON COUNTY, GEORGIA

In January 2018, Edwards-Pitman Environmental, Inc.

Newton 2019