14652 Chance, Elizabeth Second Addendum Phase I Archaeological Survey for the Proposed State Route 20 Improvements Corridor, Cherokee and Forsyth Counties, Georgia.

AECOM Technical Services, Inc.

Cherokee 2022
14653 Pietak, Lynn Marie PHASE I ARCHAEOLOGICAL SURVEY FOR THE PROPOSED BRIDGE REPLACEMENT ON THE I-20 FRONTAGE ROAD OVER THE YELLOW RIVER, NEWTON COUNTY, GEORGIA

In January 2018, Edwards-Pitman Environmental, Inc.

Newton 2019
14654 Olin, Susan Addendum Phase I Archaeological Survey of SR 9 at SR 369/Bannister Road

New South Associates, Inc (New South) conducted an addendum Phase I Archaeological Survey of a proposed roundabout at the intersection of State Route (SR) 9/Dahlonega Highway and SR 

Dawson 2021
14655 Matternes, Hugh B., Meader, J. Faith, Olin, Susan Phase I Archaeological Survey of the Widening of SR 124/Scenic Highway from US 78/SR 10/Stone Mountain Highway to Sugarloaf Parkway

On behalf of KCI Technologies, Inc. (KCI), New South Associates, Inc. (New South) conducted a Phase I Archaeological Survey in advance of State Route (SR) 124/Scenic Highway being widened from U.S.

Gwinnett 2020
14656 Lybarger, Jane, Bean, Colin, Vollman, Gwyneth Cultural Resources Survey of the Eatonton Telecommunication Project, Eatonton, Putnam County, Georgia Trileaf Project #868095

In September 2021, Trileaf Corporation (Trileaf) performed a cultural resource inventory survey for a proposed self-support communications tower located in Putnam County, Eatonton, Georgia Latitude: 33° 12’ 6.00” N, Longitude: 83° 25’ 48.97” W.

Putnam 2021
14657 Loubser, Johannes H. N. Assessment of 9JK349, Ridge Creek Jackson County, Georgia

This report describes the archaeological background, mapping, and test unit excavation of a looted gneiss outcrop on a hilltop ridge in Jackson County, Georgia.

Jackson 2022
14658 Jones, Conchita, Beazley, Matthew Phase I Cultural Resources Survey Proposed 113-Foot (Overall Height) Monopole Communications Structure Facility Georgia Power Site Blacksmith Substation 250 Blacksmith Road Leslie, Sumter County, Georgia

Environmental Corporation of America’s client, Southern Company, is proposing to construct a 113-foot tall (overall height) monopole communications structure within a Georgia Power substation located at 250 Blacksmith Road, Leslie, Sumter County, Georgia.

Sumter 2021
14659 Densmore, Julie Cultural Resources Summary Wyndam Tifton North 2202 US Highway 41 North Tifton, GA 31794

The records search was performed for the proposed Wyndam Tifton North project, which consists of 3.53 +/-acres of undeveloped land located at 2202 US Highway 41 North, Tifton, Tift County, Georgia.

Tift 2022
14660 Stallings, Patricia F., Butler, C. Scott, Stewart, Rebecca M. Phase I Cultural Resources Survey of a 2.5-mile section of the 115 kV Tugalo-Yonah Transmission Line and an Adjacent 25-acre Parcel and Assessment of Effects for the Yonah Hydroelectric Facility

Between June 7 and June 10, 2021, Brockington and Associates, Inc. (Brockington) conducted a cultural resources survey of approximately 2.5 miles of an existing 115kV transmission line located between Tugalo Dam and Yonah Dam in Habersham and Stephens Counties, Georgia.

Habersham 2021
14661 Kosalko, Katherine Phase I Archaeological Survey for the Proposed Bridge Replacement on SR 25 at the Savannah River, Chatham County, Georgia

Edwards-Pitman Environmental, Inc. (EPEI), has conducted a Phase I archaeological survey for the proposed bridge replacement on State Route (SR) 25 at the Savannah River in Chatham County, Georgia (GDOT PI No. 0013741, HP No. 81019-001).

Chatham 2019