Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
2011 Benson, Robert W., Pluckhahn, Thomas J. Phase II Testing Excavations at Five Prehistoric Sites and Phase I Cultural Resources Survey of a Service Road for the Proposed Bleckley County Public Fishing Lake, Pulaski and Bleckley Counties, Georgia

During July 2000 Southeastern Archeological Services, Inc. (SAS), under contract with the Wildlife Resources Division of the Department of Natural Resources (DNR), conducted a Phase II site testing investigation in the Ocmulgee Wildlife Management Area (WMA).

Bleckley 2001
2012 Joseph, Joseph W., Loubser, Johannes H. N. GDOT US19/SR 3 Archaeological Survey and Testing Americus to Butler

This report outlines the results of New South Associates' archaeological survey and testing of the proposed Georgia Department of Transportation's (GDOT) widening and re-alignment of USl9/SR3 between Americus and Butler in southwestern Georgia.

Schley 2000
2013 Ward, Jeanne A. Phase I Archaeological Survey: Proposed Replacement of the Oconee River Bridge and Reconstruction of Route 46, Treutlen and Wheeler Counties, Georgia

Greenhorne & O'Mara, Inc., under contract to the Georgia Department of Transportation (GaDOT), conducted an archaeological survey of an approximately 4.5 mile-long (7.2 kilometer-long) corridor along a portion of Route 46 in Treutlen and Wheeler Counties, Georgia.

Treutlen 2000
2014 Hamby, Theresa M., Loubser, Johannes H. N. Phase I Archaeological Survey of the Proposed Winder Bypass, Barrow County, Georgia

New South Associates conducted a Phase I archaeological survey of the proposed eastern bypass of the city of Winder in Barrow County Georgia. The study corridor encompassed 5.5 miles of 250 to 300 feet of right-of-way along existing roads and new location.

Barrow 2000
2015 Gardner, Jeffrey W., Atz, Leiellen M. Archaeological Survey for Proposed Reconstruction of the Interstate 16/ Interstate 75 Interchange, Bibb County, Georgia

From 21 February to 8 March 2000, Brockington and Associates, Inc., conducted Phase I intensive archaeological survey of the proposed I-16/1-75 interchange reconstruction project in Bibb County, Georgia.

Bibb 2000
2016 Gresham, Thomas H. An Archaeological Survey of Proposed Improvements to Roswell Road and Northridge Drive Intersection, Fulton County, Georgia

On June 6, 2000 an archeological survey was conducted within the area of potential effect for a proposed reconstruction of the existing intersection of five-laved Roswell Road and fivelaned Northridge Drive, in northern Fulton County.

Fulton 2000
2017 Mozingo, Dea Archaeological Resources Survey:Proposed Improvements to the McCalla Road Intersection, Rockdale County, Georgia

On April 21, 2000, Brockington and Associates, Inc., conducted an archaeological resources survey for the proposed widening of the McCalla Road intersection in Rockdale County, Georgia. This work was completed under contract with Moore Bass Consulting.

Rockdale 2000
2018 Mozingo, Dea Archaeological Resources Survey: Proposed Improvements to the Ellington Road Intersection, Rockdale County, Georgia

On April 21, 2000, Brockington and Associates, Inc., conducted an archaeological resources survey for the proposed widening of the Ellington Road intersection in Rockdale County, Georgia. This work was completed under contract with Moore Bass Consulting.

Rockdale 2000
2019 Gresham, Thomas H. An Archaeological Survey of Proposed Improvements to McGinnis Ferry and Douglas Road Intersection, Fulton County, Georgia

On October 19, 2000 an archeological survey was conducted within the area of potential effect for a proposed reconstruction of the existing intersection of two-laned Douglas Road and two-laned McGinnis Ferry Road, in north Fulton County.

Fulton 2000
2020 Gresham, Thomas H. Archeological Survey of Proposed Improvements to SR 20, Bartow County, Georga

The Georgia Department of Transportation wishes to make several sets of improvements to State Route 20 just north of Cartersville in central Bartow County. In brief, the project will widen State Route 20 from just west of Interstate Highway 75 westward toward State Route 61 (also U.S.

Bartow 2000