Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
3378 Erickson, Luke W. Archeological Reassessment of project IM-NH-285-1(347), DeKalb County

This project proposes to widen, reconstruct, and improve the 1-285 at SR 8/US 28/Lawrenceville Highway interchange and related side-streets. This project was originally surveyed and concurrence received in 1996.

DeKalb 2005
3379 Duff, Eric Anthony, McIntosh, Paul Archaeological Reassessment of Project IM-NH-75-1(227), Dooly County

The original proposed project would widen the overpass on SR 27 at Interstate 75. As part of this project, CR 155 would be relocated on new alignment approximately 660 feet from the 1-75 southbound exit ramp.

Dooly 2005
3380 Pietak, Lynn Marie Phase I Archaeological Survey of Columbia Drive, Covington Highway, and Mountain Industrial Boulevard Signal Design Project Areas, DeKalb County, Georgia

This is a GDOT archaeological report short form for negative findings for a project that would consist of traffic signal at 32 intersections within DeKalb County, Georgia.

DeKalb 2003
3381 Pietak, Lynn Marie Phase I Archaeological Survey of Lavista Road, North Druid Hills Road, Chamblee Tucker Road and Lawrenceville Highway Signal Design Project Areas, DeKalb County, Georgia

The proposed project would consist of traffic signal upgrades at 37 intersections in DeKalb County.

DeKalb 2005
3382 Pietak, Lynn Marie Phase I Archaeological Survey of Peachtree Road, Peachtree Industrial Boulevard and Perimeter Summit Parkway Signal Design Project Areas, DeKalb County, Georgia

The proposed project would consist of traffic signal upgrades at 18 intersections in DeKalb County, Georgia.

DeKalb 2005
3383 Sawyer, Angus C., Hendryx, Gregory S. Archaeological Testing of 9CM284 at the Middleton Plantation, Phase II Development Tract, Camden County, Georgia

In August 2005, Environmental Services, Inc. (ESI) performed an intensive cultural resource assessment survey to evaluate potential impacts to historic properties in conjunction with the Section 404 permitting process and in compliance with Section 106 of the National Historic Preservation Act.

Camden 2005
3384 Gardner, Jeffrey W. Addendum to Archaeological Resources Survey of the Proposed State Route 145 Bridge Replacement Over the North Fork of the Broad River, Franklin County, Georgia

This is a report short form for negative findings for the proposed bridge replacement corridor begins at the intersection of SR 51 and 145, and heads southeast along SR 145. The corridor then crosses the North Fork of the Broad River.

Franklin 2005
3385 Joseph, Joseph W. Phase I Archaeological Survey for the West Peachtree Street Corridor Streetscape Improvements, Fulton County, Georgia

This is an archaeological report short form for negative findings for the Phase I intensive archaeological survey consisted of approximately 2,484 linear feet (0.47 mile) along West Peachtree Street between 14 th and Peachtree Streets.

Fulton 2005
3386 Pietak, Lynn Marie Phase I Archaeological Survey of Simpson-W. Peachtree Rail Connection Project Area, Fulton County, Georgia

This is an archaeological report short form for negative findings for the proposed project would consist of improvements on Simpson Street between Centennial Olympic Park Drive and West Peachtree Street and on West Peachtree Street between Simpson Street and Alexander/Ralph McGill Boulevard.

Fulton 2005
3387 Gardner, Jeffrey W. Addendum to Archaeological Resources Survey of the Proposed State Route 51 Bridge Replacement Over the Middle Fork of the Broad River, Franklin County, Georgia

An addendum to report 2564, this is an archaeological report short form for negative findings. The proposed project corridor begins at the intersection of SR 51 and Oscar Rich Road (County Road [CRI 168_), and continues east along SR 51.

Franklin 2005