3608 Smith, Patrick Phase I Archaeological Survey of the Proposed Improvements at the Intersection of SR 155 and Fairview Road in Henry & Rockdale Counties, Georgia

The proposed project would add left turn lanes or extend existing left turn lanes at each approach to the 4-way intersection. The turn lanes would extend along Fairview Road and SR 155 for approximately 1000 feet in each of the four directions.

Henry 2006
3609 Erickson, Luke W. Archaeological Reassessment of Project CSSTP-0007-00(069), Douglas County

This proposed project was originally surveyed with concurrence received in 2005.

Douglas 2006
3610 Joseph, Joseph W. Phase I Archaeological Survey of the Proposed Lithonia Industrial Boulevard Extension Project, DeKalb County, Georgia

This project would consist of extending Lithonia Industrial Boulevard, on new alignment, from a newly constructed interchange at Interstate 20 (I-20) to Evans Mill Road.

DeKalb 2006
3611 Sweeney, Alexander Y. Phase I Archaeological Resources Survey for the Addition of an Interstate 85 Northbound Lane from just North of Interstate 985 to SR 20, Gwinnett County, Georgia

The project consists of the addition of one northbound Single Occupancy Vehicle (SOV) lane to I-85 in Gwinnett County. The project corridor begins approximately 1700 feet north of the I-85/I-985 interchange and extends northward to the State Route 20 interchange.

Gwinnett 2006
3612 Hendryx, Gregory S. An Intensive Cultural Resource Assessment Survey of the Creekside/Phases III & IV Development Parcel, Camden County, Georgia

In March 2006, Environmental Services, Inc. (ESI) performed an intensive cultural resource assessment survey of the 102-acre Creekside Subdivision/Phases III and IV development parcel in Camden County, Georgia, on behalf of Bay City Construction, Inc.

Camden 2006
3613 Banguilan, Alvin J. Addendum to Phase I Archaeological Survey of the Proposed Bridge Replacement: SR 31 over the Withlacoochee River, Lowndes County, Georgia

In January 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted additional survey at the site of the proposed bridge replacement at SR 31 over the Withlacoochee River, Lowndes County, Georgia.

Lowndes 2006
3614 Erickson, Luke W. Archaeological Survey of Project CSSTP-0007-00(493), Fulton County

This proposed project consists of symmetrically widening the SR 70/154 & SR 92 intersection 11' along each approach of the intersection for 800'. The existing right-of-way on SR 70/154 is approximately 150' and 130' on SR 92.

Fulton 2006
3615 Erickson, Luke W. Archaeological Reassessment of Project STP-005-2(15), Monroe County

The proposed project was originally surveyed with concurrence received in 2002.

Monroe 2006
3616 Banguilan, Alvin J. Phase I Archaeological Survey of the SR 49 Improvements, Peach County, Georgia

The proposed project would consist of improvements to SR 49 at industrial Drive and Old Macon Road in Byron, Peach County (Figure 1).

Peach 2006
3617 Pietak, Lynn Marie Addendum to Archaeological Survey of SR 280 Bridge Replacement over the Chattahoochee River in Cobb and Fulton Counties, Georgia

Original: The proposed bridge would be constructed east of the existing bridge, at a centerline-to-centerline offset distance of approximately 17 ft.

Cobb 2006