3718 Wettstaed, James R. Heritage Resources Survey for the Upland Oak Restoration Project, Compartments 104, 111, 141, 184, and 198, Oconee Ranger District, Chattahoochee-Oconee National Forests, Jasper, Putnam, and Greene Counties, Georgia

The Chattahoochee-Oconee National Forests recently completed a survey of 68 acres for a proposed commercial harvest on the Oconee Ranger District in Jasper, Putnam, and Greene Counties. This project is designed to restore upland oak habitat to meet Forest Plan standards.

Greene 2006
3719 Joseph, Joseph W. The Phase I Archaeological Survey of the Proposed Cartersville Water Main Corridor

New South Associates conducted a Phase I survey of the proposed Cartersville water main corridor between June 22 and 27, 2006. The corridor was located west of downtown Cartersville and was approximately nine kilometers (5.6 miles) in length.

Bartow 2006
3720 Smith, Patrick Phase I Archaeological Survey of the Proposed SR36 Bridge Replacement over the South River in Butts and Newton Counties, Georgia

Project Description: The proposed project would consist of the replacement of the SR 36 Bridge over the South River. A temporary detour bridge would be erected adjacent to the existing bridge; however, it has not yet been determined to which side of the road the detour would be established.

Butts 2006
3721 Smith, Patrick Phase I Archaeological Survey of the Proposed SR 36 Bridge Replacement over the Towaliga River in Butts County, Georgia

Project Description: The proposed project would consist of the replacement of the SR 36 Bridge over the Towaliga River. A temporary detour bridge would be erected adjacent to and south of the existing bridge.

Butts 2006
3722 Banguilan, Alvin J., Silliman, Garrett W. Phase I Archaeological Survey of the Proposed Peachtree City Airport/Falcon Field Hangar Expansion, Fayette County, Georgia

During March and April 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed location for the Peachtree City Airport Expansion. The project area included approximately 85 acres.

Fayette 2006
3723 Kitchings, Jim Archaeological Survey of Project-00(625), Bleckley County

This project proposes to widen and reconstruct the Cochran Bypass, SR 87, in Bleckley County.

Bleckley 2006
3724 Smith, Patrick Revised Phase I Archaeological Survey of Peachtree Road, Reachtree Industrial Boulevard and Perimeter Summit Parkway Signal Design Project Areas, DeKalb County, Georgia

The revision consists of the removal of the intersection of Perimeter Summit Parkway with Parkside Place and the intersection of Lake Heam Drive with Parkside Place and the addition of the intersection of Motor Industrial Way with the Brandsmart entrance and the intersection of Motor Industrial W

DeKalb 2006
3725 Pietak, Lynn Marie Phase I Archaoelogical Survey for Improvements to SR 23 from I-16 to Lytell Street, Candler County, Georgia

The proposed project would widen SR 23/121 from I-16 to Lytell Street (CS 610). SR 23/121 would be widened to a five lane urban roadway with two 12-foot travel lanes in each direction and a 14-foot two-way left-turn lane.

Candler 2006
3726 Pietak, Lynn Marie Phase I Archaeological Survey of the Lee Road Widening Project Area, Douglas County, Georgia

The proposed project would widen Lee Road from two-lanes to four-lanes with a raised median and turn lanes. The project would also include 12-foot roadway shoulders and sidewalks.

Douglas 2006
3727 Lotti, Teresa Ann Archaeological Reassessment of Project STP-003-00(406), Gwinnett County

An archaeological survey (Level II) was conducted in accordance with "GDOT/FHWA Cultural Resource Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Division Staff and concurred in by the Federal Highway Administration and State Historic P

Gwinnett 2006