Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
3728 Braley, Chad O. Archaeological Survey of the East Lake 115 kV Transmission Line and Substation, Henry County, Georgia

In July of 2006, Southeastern Archeological Services, Inc. (SAS) conducted a Phase I archeological survey of approximately 7.4 km (4.6 mi) of a proposed 115 kV transmission line corridor and 3.2 ha (8 ac) of a substation tract in eastern Henry County, Georgia.

Henry 2006
3729 Adams, Natalie P. Fall Line Freeway Archaeological Survey - Design Changes, Baldwin & Washington Counties, Georgia

This survey acts as an addendum to previous studies conducted for the proposed widening of the Fall Line Freeway. This survey focused on eight locations within a portion of the Fall Line Freeway that runs from CR 186 in Balwin County to CR 342 in Washington County.

Baldwin 2006
3730 Gale, Sara H. Archaeological Survey of Project EDS-84(22), Wayne County

This project proposes to change the original project design as follows: 1. Re-design the left side ditch from Station 28+30 to 224+00 to minimize impacts to GPC transmission lines and reduce the right-of-way requirements on the left side. 2.

Wayne 2006
3731 Johnson, Pamela A. Archaeological Assessment of Project BRZLB-275(10), Thomas County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments there to, project BRZLB-275(10), Thomas County, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NR

Thomas 2006
3732 Erickson, Luke W. Archaeological Reassessment of Project EDS-545(48)(50), Emanuel/Jefferson Counties

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project EDS-545(48)(50), Emanuel/Jefferson Counties, has been reassessed with respect to archeological resources, especially those on or eligible for inclusion in the National Register of Hist

Emanuel 2006
3733 Sweeney, Alexander Y. Addendum to Phase I Archaeological Survey of the Proposed SR 83 Bridge Replacement Over the Big Sandy Creek, Morgan County, Georgia

This project serves as an addendum to a previous Phase I archaeological survey conducted in advance of a proposed bridge replacement at SR 83 over Big Sandy Creek (Gardner and Wills 2003).

Morgan 2006
3734 Pietak, Lynn Marie Phase I Archaeological Survey of the Proposed Industrial Park Road Extension, Habersham County, Georgia

The proposed project location is near the Habersham County Airport in the adjoining industrial park. The proposed project would construct of a new alignment road connecting existing Industrial Park Road (Phase 1) with Duncan Bridge Road in Habersham County, Georgia.

Habersham 2006
3735 Sweeney, Alexander Y. Addendum to Archaeological Resources Survey of the Proposed SR 154 Bridge Over Bear Creek, Fulton County, Georgia

This project serves as an addendum to a previous archaeological resources survey conducted in advance of a proposed bridge replacement where SR 154 crosses Bear Creek (Gardner and Jenkins 2003).

Fulton 2006
3736 Mozingo, Dea South River Mitigation Bank: The McBride Tract

This project is a wetland mitigation located on the border of Dekalb and Rockdale counties. Proposed restoration activities are expected to enhance the ecological and hydrological functions of the proposed mitigation area.

DeKalb 2006
3737 Wettstaed, James R. Monitoring Report for Heritage Resources in Timber Sale Areas in Compartments 5, 6, 7, 8, 9, 10, Oconee Ranger District, Chattahoochee-Oconee National Forests, Jones County, Georgia

The Chattahoochee-Oconee National Forests are preparing timber harvests in several compartments on the Oconee Ranger District in Jones County.

Jones 2006