Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
3778 Braley, Chad O. Archeological Survey of the Greensboro Bypass Corridor Greene County, Georgia

This report documents the results of a Phase I archeological survey of a proposed alignment for the Greensboro Bypass in Greene County, Georgia.

Greene 2006
3779 Silliman, Garrett W. Addendum to the Phase I Archaeological Survey of the Proposed SR 140 Widening and Reconstruction Project Area, Bartow and Floyd Counties, Georgia

During August 2006, archaeologists with Edwards-Pitman Environmental, Inc. (EPEI) conducted additional survey for the widening and reconstruction of SR 140. The original survey was conducted in June 2006 by EPEI.

Bartow 2006
3780 Johnson, Pamela A. Archaeological Assessment of Project CSNHS-M003-00(235), DeKalb and Rockdale Counties

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project CSNHS-M003-00(235), in DeKalb and Rockdale Counties, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register

DeKalb 2006
3781 Gardner, Jeffrey W. Addendum to Phase I Archaeological Survey of the Proposed SR 83 Bridge Replacement Over Little Sandy Creek, Morgan County, Georgia

This project is an addendum to a previous Phase I archaeological survey conducted in advance of a proposed bridge replacement at SR 83 over Little Sandy Creek (Gardner and Will 2003). This project is located approximately two miles south of Bostwick, GA (Figure 1).

Morgan 2006
3782 Pomfret, James Archaeological Survey of Project CSMSL-0008-00(344), Clayton County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project CSMSL-0008-00(344), Clayton County, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Place

Clayton 2006
3783 Pietak, Lynn Marie Addendum to the Phase I Archaeological Survey of the Omega/Eldorado Road at I-75 Interchange, Tift County, Georgia

Original: The proposed project would reconstruct the existing interchange on Interstate 75 (I-75) and County Road (CR) 418/Omega-Eldorado Road (Exit 55) in Tift County.

Tift 2006
3784 Lotti, Teresa Ann Archaeological Reassessment of Project STP-29-1(32), Terrell County

Project STP-29-1(32) would widen, realign, and replace the existing drainage system on SR 49 in Terrell County. The project was originally surveyed in 2002 by Teresa Lotti (HPO11126-003). Since that time the project has been lengthened on the eastern end by 0.16 mile.

Terrell 2006
3785 Pietak, Lynn Marie Phase I Archaeological Survey of the Widening of I-85 from SR 17 in Franklin County, Georgia to SR 11 in Oconee County, South Carolina

The proposed project would widen the existing four-lane mainline of I-85 to six lanes in Franklin County beginning just north of SR 17 and ending just north of SR 11 in South Carolina.

Franklin 2006
3786 Oakley, Carey B. Phase I Archaeological Survey for the City of Snellville LCI Project

The proposed project is an enhancement and pedestrian improvement project that is a component of the revitalization master plan for central Snellville.

Gwinnett 2006
3787 Oakley, Carey B. Phase I Archaeological Survey for the Memorial Drive Pedestrial Connectivity

The proposed project will develop pedestrian connectivity, improve pedestrian safety, improve bicycle safety and ease pedestrian circulation along portions of Memorial Drive as well along Martin Street in downtown Atlanta.

Fulton 2006