Report Number Author(s) Title Abstract Summary County Year
3788 Pietak, Lynn Marie Addendum to the Phase I Archaeological Survey of Flakes Mill Road over the South River, DeKalb County, Georgia

Original: The proposed project would consist of the replacement of the existing Flakes Mill Road bridge over the South River in DeKalb County approximately 1.25 miles south of the intersection of Flakes Mill Road and Flat Shoals Parkway.

DeKalb 2006
3789 Atz, Leiellen M. Phase I Archaeological Survey of the Proposed Big Creek Greenway Extension, Fulton County, Georgia

This project examined a proposed 0.75-mile greenway trail extension to the existing Big Creek Greenway. The extension will extend the Big Creek Greenway from the northern end of the existing Greenway at Webb Bridge Road to Marconi Drive.

Fulton 2006
3790 Pietak, Lynn Marie Phase I Archaeological Survey of Intersection Improvements for Klondike Road at McDaniel Mill Road/Hurst Road, Rockdale County, Georgia

At this point, two alternatives are under consideration, Alternatives 2 and 4. Under Alternative 2, Hurst Road would be relocated to intersect Klondike Road via an alignment that follows the designated right-of-way immediately east of Castle Point subdivision.

Rockdale 2006
3791 Gresham, Thomas H. An Archaeological Survey of the Proposed Harbor Light Marina Shoal Creek Expansion, Hart County, Georgia

Harbor Light Marina wishes to expand its operations on Lake Hartwell by constructing a new marina facility on a peninsula north of Shoal Creek and south of Interstate Highway 85 in northwestern Hart County. The area of the proposed expansion is owned by the U. S.

Hart 2000
3792 Johnson, Pamela A. Archaeological Assessment of Project CSMLS-0006-00(699), Columbia County

CSMLS-0006-00(699) will install noise barrier walls along the shoulder break line of the proposed SR 402/I-20 corridor in Columbia County. The project is 1.48 miles long with an overlapping of 0.473 miles on the south side of the corridor.

Columbia 2006
3793 Joseph, Joseph W. Phase I Archaeological Survey of the Cannon Road Bridge over White Oak Creek

The project proposal calls for the replacement of the Cannon Road bridge over White Oak Creek. The project has a total length of 2,148.49 feet (654.86 meters).

Coweta 2006
3794 Kuhner, Arthur A., Smith, Greg C. A Preliminary Cultural Resource Assessment for the Proposed Cedar Creek Industrial Park, Crisp County, Georgia

On 16 August 2003, Environmental Services, Incorporated (EST) of Jacksonville, Florida, conducted a cultural resource reconnaissance investigation at the proposed Cedar Creek Industrial Park property in Crisp County, Georgia.

Crisp 2003
3795 Lotti, Teresa Ann Archaeological Assessment of Project MSL-0003-00(246), Meriwether and Troup Counties

Project MSL-0003-00(246) would widen SR 403/I-85 in Meriwether and Troup Counties. The project would begin at milepost 18 in Troup County and end at milepost 33 in Meriwether County. The project will also replace the bridges at Beach Creek and Flat Creek.

Meriwether 2006
3796 Lotti, Teresa Ann Archaeological Reassessment of Project STP-8016(3), Muscogee County

STP-8016(3) would widen the Talbotton Road/Warm Springs Road in Muscogee County, Georgia. This project was originally surveyed by Southeastern Archeological Services, Inc. in 1996 (HP# HP960513004).

Muscogee 2006
3797 Joseph, Joseph W. Phase I Archaeological Survey of the Green Top Road Bridge over the CSX Railroad

The project proposal calls for the replacement of the Green Top Road bridge over the CSX Railroad. Due to the sharp crest of the current bridge, they are planning to lower the bridge and replace the steel Warren truss.

Coweta 2006