Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
5835 Patch, Shawn M. Archaeological Survey of Project STP-3731(1), Floyd County

The proposed project would widen and reconstruct CR 373/Riverside Parkway from Turner-McCall Boulevard and proceed to the North Rome Bypass for a total distance of approximately 1.5 miles.

Fulton 1996
5836 Duff, Eric Anthony, Lotti, Teresa Ann Archaeological Assessment of Project NH-012-1(102)LP, Floyd County

Project NH-012-1(102)LP would add left turn lanes to CR 796 at the intersection with SR I Loop in Floyd County, Georgia. The proposed project would begin on CR 796 approximately 760 feet east of the intersection with SR 1 Loop and terminate approximately 840 feet west of the intersection.

Fulton 1996
5837 Patch, Shawn M. Archaeological Re-assessment of Project EDS-27(127), Floyd County

The proposed project would construct a southeastern bypass around the city of Rome in Floyd County.

Floyd 2001
5838 Erickson, Luke W. Archaeological Survey of Project STP-0003-00(786), Floyd County

The overall proposed project would consist of reconstructing the SR 53 median cross over at its intersection with CR 159 from adjacent left turn lanes to offset left turn lanes with right turn lanes being added to both northbound and southbound approaches. The total project length.

Fulton 1996
5839 Patch, Shawn M. Archaeological Reassessment of Project NH-012-1(85)(86), Floyd County

The proposed project would construct a bypass on the southwest side of the City of Rome, in Floyd County. The proposed project would begin at SR 20 and continue southeasterly, primarily on new location, to tie into US 27, for a total length of approximately 5.4 miles.

Fulton 1995
5840 Entorf, Robert F. Archaeological Assessment of Project FR-002-5(34), Oconee-Clarke Counties and BHF-002-5(35), Clarke County

The proposed projects would reconstruct and widen S.R. 15/U.S. 441 and U.S. 129/Macon Highway beginning at old S.R. 207/C.R. 274 north of Watkinsville and extending northeasterly to South Milledge Avenue in Athens. Required right-of-way varies from 15 to 98 feet.

Fulton 1995
5841 Paglione, Teresa L. Archaeological Assessment of Project PR-476-1(059), Clarke County

The proposed project consists of the addition of a turn lane and the relocation of two segments of Tallassee Road in Athens. The project begins approximately 1150 feet west of the entrance ramps for the Athens Bypass and extends approximately 450 feet east of Breckinridge Lane.

Fulton 1995
5842 Paglione, Teresa L. Archaeological Assessment of Project FR-003-3(44), Clarke County

The proposed project consists of the relocation of the North Athens Bypass eastbound exit ramp and the widening of the existing bridges over the bypass and the CSX Railroad.

Fulton 1995
5843 Richardson, Rick R. Archaeological Assessment of Project STPN-003-3(50), Clarke County

The proposed project would add an approximately 3.6 meter (12 feet) travel lane on the eastbound Athens Perimeter (SR 8/10 LP/15 ALT) between the eastbound on-ramp from CR 600/North Avenue and the eastbound off-ramp to southbound SR 10 LP/SR 15 for a total distance of approximately 0.3 kilometer

Fulton 1995
5844 Fernandez-Sardina, Ricardo Archaeological Assessment of Project NH-003-2(71), Clarke County

The proposed project consists of the relocation of the SR 8 southbound off ramp at US 78, and the construction of an exclusive right-turn lane from the relocated ramp to Huntington Road/CR 16, the western entrance to Georgia Square Mall. Total project length would be approximately 0.93 Km.

Fulton 1995