Report Number Author(s) Title Abstract Summary County Year
5865 Hally, David J. Preliminary Archaeological Report for Proposed Sewage System Improvements, Contract Number 10-32-RR104-039, Clarke County

This letter represents the preliminary archaeological report for the proposed sewage system improvements for the City of Athens, Contract Number 10-32-RR104-039. To date approximately 60 percent of the area has been surveyed.

Fulton 1985
5866 Anderson, Nain E. Preliminary Archaeological Assessment for all Proposed Alternate Sections: APD-056-1(31)

This report deals with the archaeological assessment of proposed construction of an approximately 100 mile four-laned facility from S.R. 306 near Coal Mountain, Georgia to the North Carolina border.

Fulton 1985
5867 Wettstaed, James R. Investigations at Site 9OG373: A Passport in Time Project, Oglethorpe county, Oconee Ranger District, Chattahoochee-Oconee National Forests, Georgia

The Oconee Ranger District of the Chattahoochee- Oconee National Forests is considering trading away 137 acres in Oglethorpe County, Georgia. This is an isolated tract of land that is over five kilometers from the nearest Forest land, and it is therefore hard to manage.

Cobb 1985
5868 McNeil, Jessica, Hellmann, Robert An Archaeological Investigation of a New Trail System at Kennesaw Mountain National Battlefield Park Kennesaw, GA

During the spring of 2007, the Southeast Archeological Center (SEAC) conducted a series of investigations focused on archeological data recovery prior to the establishment of several miles of new trails at Kennesaw Mountain National Battlefield Park (KEMO).

Fulton 1985
5869 Sweeney, Alexander Y. Phase 1 Archaeological Resources Survey For The Proposed Interstate 85 Managed Lane Extension Projects Gwinnett and Barrow Counties, Georgia

Brockington and Associates, Inc. conducted an intensive Phase I archaeological resources survey of the proposed US Interstate 85 (1-85) Managed Lanes Extension Projects in Gwinnett and Barrow counties, Georgia.

Fulton 1985
5870 Rock, Carolyn, Brockenbrough, Will Phase 1 Cultural Resources Survey and Phase 2 Arcaheological Testing of the Ratcliffe Tract

Between 27 and 31 July 2009, Brockington and Associates, Inc. conducted an intensive Phase I cultural resources survey of the proposed Ratcliffe residential development tract in Glynn County, Georgia.

Fulton 1985
5871 Dunn, Shannon M. Phase 1 Archaeological Resources Survey of West Gwinnett Street

On January 20, 2010 Brockington and Associates, Inc. conducted Phase I archaeological resources survey of proposed widening and improvements of Gwinnett Street in Savannah, Chatham County, Georgia.

Fulton 1987
5872 Hunt, Michael Phase 1 Archaeological Survey of the Proposed Chapel Hill Elementary School Safe Routes to School Project, Douglas County, Georgia

In late April 2010, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed infrastructure project for Coursey Lake Road at Chapel Hill Elementary School (GDOT Project CSSRS-0009-00(450), P.I. 0009450).

Gwinnett 1987
5873 Bedell, Jennifer Archaeological Resource Assessment of a Proposed Connector Trail From Cloudland Canyon State Park to Lula Lake Land Trust Property, Dade and Walker Counties, Georgia

The 15 miles of trails proposed for constructed is Section II of an on-going effort to establish uninterrupted recreation trails from Cloudland Canyon State Park to the Lula Lake Land Trust property in Dade and Walker Counties, GA.

Fulton 1985
5874 Koch, Christopher P. Capps Ferry Road Bridge Emergency Repairs

This project consisted of the emergency removal of flood deposited debris from the deck of the bridge over the Chattahoochee River on Capps Ferry Road (Figure 1). All work was completed October 2, 2009 and it took place within the existing 140-foot right-of-way.

Fulton 1985