Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
5875 Koch, Christopher P. Pool Road Repairs North of Milam Road

This project consisted of the emergency repair of the flood damaged portion of Pool Road where it crosses Pool Creek (Figure 1).

DeKalb 1985
5876 Gantt, Mary Elizabeth Atlanta Road Streetscape LCI Project-Addendum

Since the 2006 archeological survey, the project corridor has been shortened by approximately 1,700 feet and the maximum right-of-way and easement widths to be acquired have increased.

Fulton 1985
5877 Koch, Christopher P. South Burnt Hickory Road Emergency Repair

This project consisted of the emergency rebuilding of flood damaged side slopes and a wingwall associated with the box culvert that conveys an unnamed tributary of Beaver Creek beneath South Burnt Hickory Road (Figure 1).

Fulton 1992
5878 Pietak, Lynn Marie Addendum to Phase 1 Archaeological Survey for Improvements to SR23 from I-16 to Lytell Street Candler County, Georgia

The proposed project is located in the City of Metter, Georgia. The project would begin at the 1-16 West exit ramp and end at the intersection of SR 23/121 and Stripling Street. The total project length is approximately 4,365 feet (0.83 mile).

Clay 2006
5879 Botwick, Brad Phase 1 Archaeological Survey for Turn Lanes on SR 93 at Joyner Road, Grady County, GA

This project consists of a Phase I archaeological survey at the intersection of SR 93 and CR 85/Joyner Road in Grady County.

Fulton 1997
5880 Elliott, Daniel T. Four Emergency Repair Sites, Gwinnett County, Georgia

Emergency repairs (Programmatic Categorical Exclusions (PCEs) to three county road right of way locations in Gwinnett County. Portions of roads destroyed by epic flooding in metro Atlanta area in September, 2009 were affected.

Fulton 1985
5881 Koch, Christopher P. Blairs Bridge Road over Sweetwater Creek Emergency Road Repair

This project consisted of the emergency repair of the flood damaged bridge on Blairs Bridge Road over Sweetwater Creek. Major scouring occurred under the approach slabs, and the bent back walls were damaged at both ends of the bridge.

Fulton 1985
5882 Blackwelder, Jon R. Addendum to Phase 1 Archaeological Survey for the Proposed Bridge Replacement of CR 246/Brownwood Road over Big Indian Creek, Morgan Coutny, Georgia

Project CSBRG-0007-00(394) consists of replacing the structurally deficient, existing bridge on CR 246 over Big Indian Creek in Morgan County, Georgia. The total project length is approximately 1,700 feet beginning at M.P. 5.690 and extending to M.P. 6.040.

Fulton 1985
5883 Pietak, Lynn Marie Phase 1 Survey of the Proposed Improvements I-75 from SR 155 to SR 138 Henry County, Georgia

The proposed projects involve the addition of one lane within the existing median for both southbound and northbound 1-75 in Henry County making the existing six-lane roadway an eight-lane through facility.

Fulton 2006
5884 Blackwelder, Jon R. Addendum to the Phase 1 Archaeological Survey of the Proposed Hatcher Point Road Improvements, Ware Coutny, Georgia

The original proposed project would consist of the widening of Hatcher Point Road from the existing two-lane section to a five-lane urban section with a two-way center turn-lane, curb and gutter, and sidewalk.

Fulton 2010