Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
5895 Mozingo, Dea, Severts, Patrick Archaeological Data Recovery at the Landfell Site (9CM246)

Land Resources Companies, proposes to develop the Cumberland Harbour tract in Camden County, Georgia for residential use. Previous archaeological investigations by Brockington and Associates, Inc., documented significant archaeological sites within this tract (Fuller 2003).

Clay 1996
5896 Hise, Alana, Silliman, Garrett W. Phase 1 Archaeological Survey of the Proposed Safety Improvements to State Route 136, Pickens County, Georgia

During February 2010, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed safety improvements to State Route (SR) 136 in Pickens County, Georgia.

Clay 1993
5897 Howard, Russell W. Cultural Resource Survey Proposed Road Widening Project Tallulah Ranger District Chattahoochee National Forest Rabun County, Georgia

An intensive cultural resources survey was conducted of a road widening corridor within the Tallulah Ranger District of the Chattahoochee National Forest. The project corridor is approximately 640 meters (2,100 feet) long and located 7.0 kilometers (4.4 miles) northwest of Clayton, Georgia.

Clay 1993
5898 Warhop, Jennifer R., Hamby, Theresa M. Phase 1 Archaeological Survey of the Athens Rail to Trail Clarke County, Georgia

New South Associates conducted a Phase I Archaeological Survey for the Athens Rail to Trail corridor in Clarke County, Georgia, under subcontract to O'Brien and Gere.

Clarke 1982
5899 Whitley, Thomas G. Phase 1 Cultural Resources Survey of the Hugh A. Wyckoff Regulatory and Operational Improvements Project Cobb County, Georgia

In November of 2009 and February 2010, Brockington and Associates, Inc. completed a Phase I cultural resources survey of the proposed Hugh A. Wyckoff Regulatory and Operational Improvements Project in Cobb County, Georgia. This work was performed under contract with Ch2M Hill, Inc.

Cobb 2009
5900 Dye, Melissa M., Gorman, Rebecca D. An Intensive Archaeological Assessment Survey at the Savannah-North Aviation Development Tract, Chatham County, Georgia

In February and March 2010, Environmental Services, Inc.

Chatham 2010
5901 Price, George D., Kistler, Sally Phase 1 Archaeological Survey for the Dug Gap-Center Point Transmission Line, Whitfield County, Georgia

TRC conducted a Phase I cultural resources survey for the proposed Dug Gap-Center Point TVA transmission line project in Whitfield County, Georgia, south of Dalton, between April 24-28, 2001. The survey included both archaeological and historic structures surveys.

Whitfield 2001
5902 Ward, Jeanne A. Georgia Feed 115/25 kV Substation, Randolph County, Georgia

GTC proposes to construct the Georgia Feed 115/25 kV Substation east of Cuthbert, Georgia in Randolph County (Figure 1). An archaeological survey was conducted in compliance with Section 106 of the National Historic Preservation Act of 1966, as amended through 1992 (16 U.S.C. 470).

Randolph 1999
5903 Charles, Joseph Cultural Resources Survey of the Proposed US 1 Industrial Park Toombs County, Georgia

From 30 January - 6 February 2001, Brockington and Associates, Inc., conducted a cultural resources survey for a proposed industrial park to be located at the intersection of U.S. Highway 1 and State Route (SR) 130, approximately 0.8 km (0.5 mi) north of Lyons, Georgia (Figure 1).

Toombs 2001
5904 Steinen, Karl T. Archaeological Survey of the Proposed Football Field Georgia Sheriff's Youth Homes, Pineland/Camp Pioneer Troup County, Georgia

On January 16, 2001, I conducted an archaeological survey of approximately 1acre of land in Troup County, Georgia. This survey determined that there are no archaeological sites present on the designated property. A single artifact, designated an Isolated Find was recovered.

Troup 2001