Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
6005 Malphurs, Cecil Archaeological Assessment of Project EDFR-023-1(8) and (9), Coffee/Atkinson Counties

This project proposes to widen U.S. 441/S.R. 31 from U.S. 82 in Pearson to the current 4 lane in Douglas -- a distance of 12.5 miles. A corridor consistent with the proposed rights-of-way was surveyed for the entire length of the project.

Morgan 2010
6006 Hart, Barry D. Archaeological Assessment of Project BFR-036-1(8), Coffee County

An archaeological survey (Level I ) was conducted in accordance with "GDOT Archaeological Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Preservat

Henry 2010
6007 Richardson, Rick R. Archaeological Assessment of Project STP-090-1(16), Coffee County

The proposed project would widen SR 135/US 221 from SR 206 Connector to just south of CR 146, and from approximately 260.60 m (855 ft) south of CR 148 to approximately 201.17 m (660 ft) north of CR 148. Additionally, CR 148 will be realigned to intersect SR 135/US 221 at 90 degrees.

Ware 2010
6008 Hart, Barry D. Archaeological Assessment of Project FR-023-2(5), Coffee County

The project involves the replacement of the bridge over Seventeen Mile River on S.R. 31/U.S. 441. The bridge will be replaced within the existing 100200 feet of right-of-way.

Fulton 2010
6009 Richardson, Rick R. Archaeological Assessment of Project STP-105-1 (26), Coffee County

The proposed project is an intersection improvement on S.R. 158 and C.R. 553/McDonald Road in the City of Douglas. The intent of the project is to add a center left turn lane at all four approaches at this intersection. The existing right-of-way on S.R.

Cobb 2010
6010 Richardson, Rick R. Archaeological Assessment of Project STP-1700(3), Coffee County

The proposed project consists of the widening and reconstruction of SR 206/Perimeter Road. The project begins at the intersection of SR 32 and ends at the intersection of US 441/SR 31. The existing two-lane roadway will. be widened symmetrically to a five-lane roadway.

Houston 2010
6011 Richardson, Rick R. Archaeological Assessment of Project STP-1704(3), Coffee County

The proposed project consists of the improvement of the intersection of SR 158/Baker Highway and Shirley Avenue in the city of Douglas. The project will begin approximately 106.7 m (350 ft) west of the intersection and will end approximately 213.4 m (700 ft) eastward.

Ware 2002
6012 Richardson, Rick R. Archaeological Assessment of Project NH-079-1(37), Coffee County

The proposed project consists of the improvement of the intersection of SR 135/US 221 and McDonald Road. The project will add a 4.3 m (14 ft) wide center turn lane at all four approaches at the intersection. No additional right-of-way will be required for the completion of the project.

Jackson 2008
6013 Danchetz, Frank L. Archaeological Assessment of Project FR-090-1(12), Coffee County

The proposed project would reconstruct and widen S.R.135/U.S.221 in Douglas. The project as proposed would begin at the intersection of S.R.32 then would extend along existing S.R.135/U.S.221 to the intersection of the North Douglas Bypass/ S.R.206 Conn.

Cobb 2010
6014 Entorf, Robert F. Archaeological Assessment of Project SPT-079-1(43), Coffee County

In September 2001, New South Associates began an archaeological assessment and survey of the proposed M & R station for Southern Natural Gas Company (SNG).

Coffee 2010