Report Number Author(s) Title Abstract Summary County Year
5965 Lotti, Teresa Ann Archaeological Reassesment of Project STP-004-2(31), Jones County

Project STP-004-2(31) would construct the Gray Bypass in Jones County. This proposed project was subjected to four previous archaeological surveys: September 2000 and July 2001 by Southeastern Archeological Services, Inc.

Madison 1996
5966 Baughman, Pamela J. Archaeological Reevaluation of Project STP-00-0164-01(029), Clayton/ Fayette Counties

The proposed project would widen and reconstruct State Route (SR) 54 in Clayton and Fayette Counties. This widening would begin just north of McDonough Road in Fayette County and would extend to US 19/US 41/Tara Boulevard in Clayton County for a distance of 5.3 miles.

Clarke 1997
5967 Gale, Sara H. Archaeological Survey of Two Surplus Parcels, Parcels # 133A & 133 B adjacent to I-675, Clayton County

The proposed project is the identification of surplus properties owned by the Georgia Departmenf of Transportation that will be placed on the market by the Department's Right-of-Way Office.

Clarke 2000
5968 Pomfret, James Archaeological Assessment of Project M004109, Tift County

Due to the emergency nature of the repairs, the following project was completed prior to environmental clearance. The project consisted of the replacement of the triple barrel 10 ft. X 7 ft. culvert located along Whiddon Mill Road over Heard Creek in Tift County (see attached location map).

Madison 2000
5969 Baughman, Pamela J. Archaeological Survey of Project CSSTP-0006-00(453), PI#0006453, Coweta County

The proposed project would consist of traffic ignal upgrades at three intersections along the roadways of SR 14 and SR 16 in Newnan, Coweta County.

Clarke 2007
5970 Lotti, Teresa Ann Archaeological Assessment of an Emergency Repair of CR 279/Morven-Barwick/Coffee Road Culvert at an Unnamed Creek, Brooks County

The proposed project would repair the winswell and apron for a culvert at an unnamed creek on CR 279/Morven-Barwick Road/Coffee Road in Brooks County, Georgia. The existing right-ofway for CR 279/Morven-Barwick Road/Coffee Road is 50 feet. All work would occur within the existing right-of-way.

Clarke 2003
5971 Lotti, Teresa Ann Archaeological Reassessment of Project EDS00-0000-00(346), Baldwin County

Project EDSOO-0000-00(346) would construct the Fall Line Freeway in Baldwin County. This proposed project was subjected to several previous archaeological surveys: January 1986, November 1993, December 1993, July 1996, June 1999, and October 2000 by Southeastern Archeological Services, Inc.

Hall 2010
5972 Mustonen, Heather Archaeological Assessment of GDOT Emergency Project P.I. No. 0010049, Dekalb County, HP-100907-012

The project is an emergency project that consisted of the repair of a washed out slide area along the westbound side of US 78/SR 10 at Milepoint 7.3 in the vicinity of the exit ramp to SR 236/Hugh Howell Road.

Cherokee 1982
5973 Lotti, Teresa Ann Archaeological Assessment of Emergency Repairs at the bridges on CR 280/Lawson Pond Road at the Little River and Little River Overflow, Brooks County

M004115 would repair the scouring at several bents along the CR 280/Lawson Pond Road bridge over tfie Little River Overflow. M004116 would replace the endbent of the CR 280/Lawson Pond Road bridge over the Little River.

Bartow 1947
5974 Lotti, Teresa Ann Archaeological Reassessment of Project STP-0007-00(149), Douglas County, HPD# HP051024-005

Project STP-0007-00(149) would improve the existing substandard intersection of SR 92/Dallas Highway and Thompson Street at Forrest Avenue in Douglasville, Georgia. This project was originally cleared by Shawn Patch in 2005.

Cherokee 1947