Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
8525 Patch, Shawn M. An Archaeological Survey of the Proposed Loop Ramp Interchange at the Intersection of SR 17/SR 72, Elbert County, Georgia

Between November of 2000 and November of 2001 staff archaeologists from the Georgia Department of Transportation conducted an archaeological reassessment of GDOT project EDS-72(33), Elbert County, Georgia.

Gwinnett 2009
8526 Silliman, Garrett W., Hise, Alana Addendum to the Phase I Archaeological Survey of the SR 32 over the Flint River Bridge Replacement, Lee and Worth Counties

During August 2010, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed improvements to the State Route (SR) 32 bridge over the Flint River in Worth and Lee counties.

Chatham 2014
8527 Lewis, Clifford Thomas Additional Phase I Archaeological Survey for the Proposed SR 17 Widening, Stephens and Franklin Counties, Georgia

On June 7, 2011, Edwards-Pitman Environmental, Inc. (EPEI) conducted additional Phase I archaeological survey of the proposed State Route (SR) 17 Widening in Stephens and Franklin counties, Georgia [Georgia Department of Transportation (GDOT) Project Nos. EDS-545(20) & EDS-545(37), P.L Nos.

Fayette 2015
8528 Pietak, Lynn Marie Archaeological Data Recovery Plan for Site 9PU20, Pulaski County, Georgia

Edwards-Pitman Environmental, Inc. (EPEI), under a contract with PBS&J, is submitting this data recovery plan for site 9PU20, located on SR 230 in Pulaski County, Georgia.

Glascock 2014
8529 Williams, Siska District 4 Maintenance Projects

Maintenance Projects in Colquitt and Decatur Counties (milling, inlaying existing curb and gutter sections, and adding curb cut ramps to existing sidewalk connections).

Coweta 2015
8530 Williams, Siska District 1Maintenance Projects along SR 53 WB & SR 369 at the Chattahoochee River

Maintenance Project in Forsyth and Hall Counties (remove the existing copolymer overlay and replace it with another polymer overlay system).

Coweta 2015
8531 Silliman, Garrett W. Phase I Archaeological Survey of the Proposed Improvements to the SR 120/Dallas Highway Project Corridor, Cobb County, Georgia

During August and September 2010, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed improvements to State Route (SR) 120/Dallas Highway in Cobb County, Georgia. The proposed project (Georgia Department of Transportation [GDOT] Project No.

Banks 2014
8532 Lewis, Clifford Thomas Additional Phase I Archaeological Survey of Cleveland West Bypass, White County, Georgia

On June 14, 2011, Edwards-Pitman Environmental, Inc. (EPEI) conducted additional Phase I archaeological survey for two new areas of expanded easement along the proposed Cleveland West Bypass in White County, Georgia.

Cobb 2015
8533 Morse, Dan F. Highway Salvage Archaeology-Georgia Project I-75-1 (24), Lowndes County, Georgia

The tentative interpretation of the Lilly Site (9LW2), without benefit of formal analysis, is that there was sporadic seasonal occupation in the area of the lakes, perhaps during times of drought.

Richmond 2015
8534 Benson, Robert W., Pluckhahn, Thomas J., Jones, Scott Phase II Test Excavations at Five Prehistoric Sites and Phase I Cultural Resources Survey of a Service Road For the Proposed Bleckley County Public Fishing Lake, Pulaski and Bleckley Counties, Georgia

None Available

Gwinnett 2014