Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
9901 McCarley, Billy J. Negative Findings Phase I Archaeological Survey of the Proposed Livestock Telecommunications Facility in Carrollton, Carroll County, Georgia

A Phase I archaeological survey was performed on March 1, 2015 of the proposed lease area and access of the Livestock telecommunication facility located in Carrollton, Georgia (33° 36' 52.1" N, 84° 59' 36.2" W).

Carroll County, GA 2015
9902 Carter, Sam Proposed Telecommunications Tower Site Site Name: Metropolitan Atlanta, Fulton County, Georgia

Terracon conducted a Phase I archaeological survey of the proposed Metropolitan cell tower site on April 18, 2014. The archaeological survey area was equal to the area of the proposed tower site, its related utility easements, and the proposed access road (Figure 2).

Fulton County, GA 2014
9903 Janssen, Virginia M. SECTION 106 REVIEW FCC FORM 620 Workmore Site Telfair County, GA

Verizon Wireless has proposed to construct a telecommunications tower facility in

Telfair County, GA 2015
9904 Beazley, Matthew Section 106 Review TCNS ID 105510 Proposed 180-Foot Monopole Communications Structure (193-Foot Overall Height Including Appurtenances) Georgia Highway 20 Canton, Cherokee County, Georgia

Environmental Corporation of America (ECA) has completed Section 106 Review Documentation, FCC Form 620, for our client, Georgia Power Company, concerning a proposed communications structure located off of Georgia Highway 20, near Canton, Cherokee County, Georgia.

Cherokee County, GA 2014
9905 McCarley, Billy J. Negative Findings Phase I Archaeological Survey of the Proposed Harrison NSB-GA Telecommunications Facility in Georgetown, Quitman County, Georgia

A Phase I archaeological survey was performed on April4, 2015 of the proposed lease area and access of the Harrison NSB-GA telecommunication facility located in Georgetown, Georgia (31° 51' 39.4" N, 85° I' 46.1" W).

Quitman County, GA 2015
9906 Price, George D. Phase I Cultural Resource Survey Archaeological and Historic Properties Survey Ridgeline Property Group Highway 53 Site Braselton, Jackson County, Georgia

Greenhouse CONSULTANTS incorporated completed a Phase I archaeological survey of the approximately 70+ acre Ridgeline Property Group. Highway 53 project development property in Braselton, Jackson County, Georgia.

Jackson County, GA 2018
9907 McCabe, Robert H. Phase I Archaeological Survey of the Proposed Plier Telecommunications Facility in Vidalia, Toombs County, Georgia

An intensive Phase I archaeological survey was performed on May 22, 2015 of the proposed lease area and access {also called survey area) of the Flier telecommunication facility located in Vidalia, Georgia (32° 19' 50. I" N, 8~ 24' 16.88" W).

Toombs County, GA 2015
9908 Elliott, Daniel T. CULTURAL RESOURCES SURVEY OF U.S. ARMY’S CAMP FRANK D. MERRILL, LUMPKIN COUNTY, GEORGIA

Camp Frank D. Merrill is home to the 5th Ranger Training Battalion, U.S. Army. The ranger camp was established in 1952 and includes 282 acres of the north Georgia mountains in Lumpkin County (Figure I).

Lumpkin County, GA 2016
9909 Millis, Tracy L. PHASE I CULTURAL RESOURCE SURVEY OF THE GEORGIA PORTION OF THE SABAL TRAIL PROJECT, STEWART, WEBSTER, TERRELL, LEE, DOUGHERTY, MITCHELL, COLQUITT, BROOKS, AND LOWNDES COUNTIES, GEORGIA DRAFT REPORT – ADDENDUM 5

Saba! Trail Transmission, LLC (Saba!

Stewart County, GA 2016
9910 Beazley, Matthew Section 106 Review TCNS ID 113638 Proposed 150-Foot Monopole Communications Structure (163-Foot Overall Height Including Appurtenances) South Old Peachtree Rd. Norcross, Gwinnett County, Georgia ECA Project No. Q0922

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Gwinnett County, GA 2014