Back to top

Baughman, Pamela J.

Report Number Author(s) Title Abstract Summary County Year
7011 Baughman, Pamela J. Bridge Replacement on southbound (SB) SR 11/SR 49/US 41 at Rocky Creek

This project consists of the replacement of the SR 11/SR 49/US 41 SB bridge over Rocky Creek near the city of Macon, in Bibb County. The existing bridge measures approximately 102feet in length and the typical section consists of three 13-foot travel lanes.

Chattahoochee 1991
7016 Baughman, Pamela J. SR 119 from Liberty County Line to SR 30

The proposed project would mill, resurface, and overlay SR 119 beginning at the Canoochee Creek Bridge, just past the Liberty County Line (MP 0.00) to SR 30 (MP 5.94) in Bryan County, near Pembroke.

Floyd 1976
7021 Baughman, Pamela J. SR 4/US 301 at CS 462/Main St. and SR 23 at Main St. in Folkston

The project proposes to improve the existing drainage structures and drainage systems at specific points in the area on both SR 4/US 301 and SR 23/121, as well as on Maple Street and Robinson Street.

Fannin 1982
7031 Baughman, Pamela J. Proposed Improvements to SR 3/US 19

The proposed project would widen SR 3/US 19 in Thomaston, Georgia, in Upson County. The existing roadway is an urban section with two lanes in each direction and a two-way left turn lane on the southern third of the project.

McIntosh 1984
7037 Baughman, Pamela J. SR 16 at CR 35/Vaughn Rd. & CR 507/Rover-Zetella Rd.

The proposed project involves improvements to the intersection of SR 16 and CR 35/Vaughn Rd. and CR 507 /Rover-Zetella Rd. The project would widen SR 16 symmetrically to provide for 12' left and right turn lanes in each direction.

Fulton 1977
7045 Baughman, Pamela J. I-75 at US 41/US 76/SR 3 (Rocky Face Interchange)

This project consists of the reconstruction of the 1-75 at SR 3/US 41/US 76 (Rocky Face) interchange located in Whitfield County. The interchange configuration will remain as a diamond interchange with an additional ramp in the northwest quadrant.

Habersham 1977
7386 Baughman, Pamela J. Addendum to the Phase I Archaeological Survey of the SR 96 Corridor, Houston and Twiggs Counties, Georgia

This addendum report discusses the findings of a reevaluation survey undertaken to address project changes for GDOT Projects STP00-0155-01 (023), CSNHS-0007-00(251), and STP00- 0155-01(022), P.l. No. 322470, 0007251, and 322460, Houston and Twiggs Counties, Georgia.

Twiggs 2012
7434 Baughman, Pamela J. Intersection Improvement at Sr 10/Freedom Parkway and Boulevard

This project includes improvements to the intersection of SR 10/Freedom Parkway and CS 520/Boulevard.

McDuffie 2001
7509 Baughman, Pamela J. Safe Routes to School, Newnan Crossing Elementary

The proposed project would consist of the construction of a 5-foot sidewalk along the south side of Lower Fayetteville Road from Belltree Circle to the east school drive. A total of four ADA ramps and domes are proposed at Belltree Circle and at both school drives.

Clarke 2005
7510 Baughman, Pamela J. Safe Routes to Schools (SRTS) at Love Nolan, Sandtown Middle, and Seaborn Lee Elementary

This project consists of pedestrian and bicycle infrastructure improvements in south Fulton County in the vicinity of Love T. Nolan Elementary, Sandtown Middle, and Seaborn Lee Elementary.

Floyd 2005
Displaying 11 - 20 of 114