Back to top

Entorf, Robert F.

Report Number Author(s) Title Abstract Summary County Year
4677 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-0781(11), Wilkinson/ Baldwin Counties

The proposed project would consist of the paving of approximately 0.6 m (2 ft left and right) of the existing shoulders on SR 243.

Baldwin 1996
4683 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-00MS(142), Multiple Counties

The proposed project would involve the encasing of the existing steel H-beams in concrete to strengthen the bridge supports at locations throughout the state. Existing right-of-way is approximately 30.5 m (100 ft). All construction will be limited to the existing right-of-way.

Bartow 1997
4691 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-00MS(295), Barrow County

The proposed project would consist of the leveling and resurfacing of SR 211 in Barrow County. Also included in the proposed project would be the paving of 0.6 m (2 ft) of the existing shoulders of SR 211.

Barrow 1998
4692 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-1308 (9), Barrow/Walton County

The proposed project would consist of the paving of approximately 0.6 m (2 ft left and right) of the existing shoulders on SR 81 in Bulloch County. The project would begin at the intersection of SR 20 in Walton County and end at Stafford Street in the city of Winder in Barrow County.

Barrow 1996
4693 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-0910 (15), Barrow County

The proposed project would consist of the paving of 0.6 m (2 ft) of the existing shoulders of SR 124. The proposed project would begin at the Gwinnett/Barrow County line and would end at the SR 53 intersection in Jackson County.

Barrow 1998
4695 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of STP-065_3(52), Barrow County

The proposed project consists of improvements to the intersection of SR 53 and Rockwell Church Road/CR 4 just north of the city of Winder.

Barrow 1998
4696 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of BRZLB-13(13), Barrow County

The proposed project consists of the replacement of the bridge on CR 125/McElhannon Road over the Apalachee River just south of the city of Bethlehem.

Barrow 1998
4699 Entorf, Robert F. Archaeological Assessment of Project F-055-1(37) & (38), Banks County

The proposed project is the reconstruction and partial relocation of U.S. 441/S.R. 15 and S.R. 198 and would include upgrading of existing road sections as well as extensive new location. The proposed project would begin at the intersection of U.S. 441/S.R. 15 and C.R.

Banks 1987
4716 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of BLDG-DST6-95(41), Bartow County

The proposed project consists of the construction of a new metal District Six Sign Shoo building. The building would be located adjacent to Old Martin Road/CR 130 across the street from an existing maintenance compound northwest of the city of Cartersville.

Bartow 1997
4717 Entorf, Robert F. Archaeological Assessment of Project EDS-460(1), Bartow, Cherokee, and Forsyth Counties

The proposed project would construct on new location a connector between 1-75 in Bartow County and S.R.371 in Forsyth County. The proposed project consists of two alternate routes.

Bartow 1989
Displaying 31 - 40 of 664