Back to top

Entorf, Robert F.

Report Number Author(s) Title Abstract Summary County Year
4644 Entorf, Robert F. Archaeological Assessment of Project EDS-545(15), Bacon County

The proposed project would widen and reconstruct US 1/SR 4 north of the city. of Alma.

Bacon County, GA 1995
4653 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project NH-IM-75-3(227), Bartow/Gordon Counties

The proposed project would consist of milling, leveling, and resurfacing of the roadway "and shoulders of SR 401/I-75. The project would begin at the northern end of the CSX railroad bridge north of Cartersville and end at the southern end of the bridge over SR 156 in Gordon County.

Bartow County, GA 1996
4654 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-00MS(186), Bartow, Chattooga, Floyd, Gilmer, Gordon, Murray, Pickens, Walker, and Whitfield Counties

The proposed project would involve the encasing of the existing steel H-beams in concrete to strengthen the bridge supports at locations throughout the northwestern portion of the state. Existing right-of-way varies from bridge to bridge.

Bartow County, GA 1996
4657 Higginbotham, Brandon, Entorf, Robert F. Archaeological Assessment of Project PR-39 (007), Baker County

Project PR-39 (007) allows for grading, drainage, base and surfacing on approximately 2.3 km (1.4 mi) of roadway on CR 39 and CR. 43 in Baker County. The proposed project on CR 39 would begin at CD 30 and would continue northerly for 1.4 km (.9 mi) to CR 43.

Baker County, GA 1995
4658 Entorf, Robert F. Archaeological Assessment of Project PR-122(007), Baker County

Project PR-122(007) allows for grading, drainage, base and surfacing on approximately 3.41 km (2.12 mi.) of roadway on CR 122/Pot Plane Road. The proposed project on CR 122 would begin at CR 1 and end at the Dougherty County line.

Baker County, GA 1995
4667 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-0686(25), Wilkinson/Baldwin Counties

The proposed project would consist of the paving of the existing shoulders [4.9 m (1.5 ft)] of SR 112. The project would begin at MP 23.28 and end at MP 3.00 just south of the city of Milledgeville in Baldwin County. All construction will be limited to the existing shoulders.

Baldwin County, GA 1996
4670 Entorf, Robert F. Archaeological Assessment of Project BHF-042-2(31), Baldwin/ Putnam Counties

Proposed project would reconstruct and widen S.R. 24/U.S. 441 beginning at a point approximately 380 feet south of the Little River then extending northerly to a point approximately 800 feet north of Cay Drive. The intersection of Cay Drive and S.R. 24/U.S.

Baldwin County, GA 1987
4674 Entorf, Robert F. Archaeological Assessment of Project FR-004-2(24) Baldwin/Jones Counties

The proposed project would add two eastbound passing lanes and one westbound passing lane to S.R. 22 between Gray in Jones County and a point just west of Milledgeville in Baldwin County. An additional 10 feet of right-of-way would be required. Passing Lane No. 1 (eastbound) would begin at M.P.

Baldwin County, GA 1988
4675 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of STP-042-2(35), Baldwin County

The proposed project consists of the removal of the Central of Georgia Railroad bridge over SR 29/US 441 south of Milledgeville and drainage improvements at two other locations in the city of Milledgeville. The existing right-of-way is approximately 18.3 m (60 ft).

Baldwin County, GA 1996
4676 Entorf, Robert F., Fleming, Sherry Archaeological Assessement of BRSLB-2109(1), Baldwin County

The proposed project consists of the replacement of the bridge on CR 470 (Pancras Road) over Camp Creek. The proposed project would begin approximately 89.3 m (293 ft) west of Camp Creek and would end approximately 103.9 m (341 ft) east of Camp Creek.

Baldwin County, GA 1997
Displaying 21 - 30 of 664