4718 |
Entorf, Robert F., Fleming, Sherry |
Archaeological Assessment of BHF-012-1(95), Bartow County |
The proposed project consists of the replacement of the existing structurally deficient east and_ westbound bridges on SR 20/US 411 over the W & A Railroad and SR 293. Additionally, the project will include the widening of the bridges by 4.66 m (15.3 ft). |
Bartow County, GA |
1996 |
4719 |
Entorf, Robert F. |
Archaeological Assessment of STP-001-5(50), Bartow County |
The proposed project consists of the improvement of the intersection of SR 3/US 41 and Mockingbird Drive/Center Road. The project begins approximately .48 km (.3 mi) south of the intersection and ends approximately 1.61 km (1 mi) north of the intersection. |
Bartow County, GA |
1995 |
4720 |
Higginbotham, Brandon, Entorf, Robert F. |
Archaeological Assessment of Project NH-12-1(94), Floyd/Bartow |
The proposed project consists of resurfacing on SR 20.in Floyd and Bartow Counties. The project begins at mile post 20.79 in Floyd County and continues easterly to an end point at mile post 12.12 in Bartow County for a total of 29.58 kilometers (18.39 miles). |
Floyd County, GA |
1995 |
4721 |
Entorf, Robert F. |
Archaeology Assessment of Project FR-019-1(12), IR-75-3(171), Bartow County |
The proposed projects would widen and reconstruct S.R. 140 between U.S. 41 and 1-75 in north Adairsville. The combined projects would begin at the intersection of U.S. 41 and would proceed easterly to a point approximately 1800 feet east of 1-75. |
Bartow County, GA |
1987 |
4722 |
Entorf, Robert F. |
Archaeology Assessment of Project PR-264-1(015) Section 1 & 3 and RRS-000S(591), Bartow County |
The proposed projects would construct on new location a connector which would parallel the northeast side of 1-75 between Grassdale Road and U.S. 411 north of Cartersville. |
Bartow County, GA |
1988 |
4740 |
Entorf, Robert F. |
Archaeological Assessment of Project PRLOP-11(019), Berrien County |
The proposed project would consist of gradinq, drainage, base, and surfacing on C.R. 11 in Berrien County. The proposed project would begin at the intersection of S.R. 11/U.S. 129 and C.R. 11 north of Nashville and would continue easterly along C. R. 11 to an ending point at C. R. 18. |
Berrien County, GA |
1996 |
4744 |
Entorf, Robert F., Fleming, Sherry |
Archaeological Assessment of STP-1177(1), Ben Hill/ Wilcox County |
The proposed project consists of the paving of 0.6 m (2 ft) of the existing shoulders along SR 233. The project would begin at the intersection of SR 90 in Ben Hill County and would end at the intersection of SR 112 in Wilcox County. |
Ben Hill County, GA |
1996 |
4749 |
Entorf, Robert F., Fleming, Sherry |
Archaeological Assessment of Project STP-2718(4), Ben Hill/ Irwin / Coffee Counties |
The proposed project would consist of the paving of 1.2 m (4 ft) of the existing shoulders of SR 206 in Ben Hill County. Also included in the proposed project would be the leveling and resurfacing of the entire pavement width. |
Ben Hill County, GA |
1998 |
4750 |
Entorf, Robert F., Fleming, Sherry |
Archaeological Assessment of Project STP-2943(4)01, Ben Hill County |
The proposed project would consist of the paving of approximately 0.6 m (2 ft left and right) of the existing shoulders on US 319/SR 107. The project would begin at the intersection of SR 206 northeast of Fitzgerald and end at the Ben Hill-Coffee County line. |
Ben Hill County, GA |
1995 |
4754 |
Entorf, Robert F., Fleming, Sherry |
Archaeological Assessment of Project STP-34-2(31), Irwin-Ben Hill Counties |
The proposed project would consist of the paving of approximately 0.6 m (2 ft left and right) of the existing shoulders on US 129/SR 11. The project would begin at the curb and gutter section in Ocilla and will end at the intersection of SR 107 in Ben Hill County. |
Ben Hill County, GA |
1995 |