Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
11079 Duff, Eric Anthony, Fleming, Sherry Archaeological Assessment of Project SAMA-78(14), Treutlen County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project SAMA-78 (14), Treutlen County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRH

Treutlen 1995
11080 Rotenstein, David S. Bridge Review of BRZLB-217(12), Newton County

Termini, description of new structure, right of way, location of realignment or detour, map with north and flow arrows. Project begins approximately 250' southwest of stream crossing and ends approximately 250' northeast of stream crossing. A triple 9' x 7' concrete bridge culvert is proposed.

Newton 1986
11081 Bowen, William R. Archaeological Surveys and Assessments of County Bridge Projects, District Five, BRFLB-030-4(3), Bryan County

In compliance with Section 106 of the National Historic Preservation Act of 1966 , the following projects were surveyed with respect to archaeological resources; especially those which may be eligible for inclusion in the National Register of Historic Places (NRHP) .

Bryan 1979
11082 Moore, Sherry Fleming, D'Avino, Gail A. Project NH-00MS(287), Cobb/Catoosa Counties: Determination of No Undertaking

The subject project would consist of the jacking of several bridges in Cobb and Catoosa Counties to obtain clearances below the bridges of 17 ft. All bridges are over roadways with no drainage crossings. The proposed project would include bridges at the following locations:

Cobb County

Cobb 1999
11083 Larson, Lewis H. Georgia Project F-087-1(2) Clayton County (P.E.) Negative Declaration

Applicant: Department of Transportation Project: Georgia Project F-087-1(2) Clayton County (P.E.)

Negative Declaration State Clearinghouse Control Number: 73-01-26-01 September 18, 1973

Clayton 1973
11084 Alston, Robert L. Archaeological Survey of Bridge Replacement Projects, RS-1360(3), Gilmer County

Because the projects are in-place, no new areas will be impacted. For this reason no archaeological field inspection is necessary and the archaeological resources of the State will not be affected. RS-1360 (3) Coosawattee River Bridge on SR 282 - Existing bridge is to be retained and widened.

Gilmer 1980
11085 D'Avino, Gail A., Entorf, Bob P. Project STPN-056-2(25), Gilmer County: Determination of No Undertaking

The subject project would consist of the leveling and resurfacing of SR 515 from MP 4.93 to MP 9.45 in Gilmer County. No earthwork would be involved in the process of leveling and resurfacing the existing roadway.

Gilmer 1997
11086 Cole, Hal Preliminary Assessment of Historic Involvement for Draft Document Project F-111-1(16), Chatham County

This transportation project has been surveyed for historic resources in compliance with Section 106 of the National Historic Preservation Act of 1966, and amendments thereto The survey boundary and methodology were established using GDOT/FHWA Cultural Resources Survey Guidelines.

Chatham 1986
11087 Moore, Sherry Fleming, D'Avino, Gail A. Project IM-STP-00MS(257), Cobb/Dekalb Counties: Determination of No Undertaking

The subject project would consist of the joint removal and replacement and joint repair of 5 bridges in Cobb and Dekalb Counties. The following bridges are included in the proposed project:

1-285 over 1-85

1-85 SB over l-285 EB

1-285 EB over I-285 NB

Cobb 1999
11088 Hart, Barry D. Archaeological Assessment of Project BRS-2063(2), Meriwether County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project BRS-2063(2), Meriwether County, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (N

Meriwether 1984