Report Number Author(s) Title Abstract Summary County Year
11500 Entorf, Robert F. Archaeological Assessment of Project BHF-149-1(21), Bulloch County

Replace bridge on the existing alignment with a triple 8'X6' concrete culvert. Reconstruct approaches to 24' paving width, with 10' shoulders. No required R/ V; easement required for construction on both ends of culver t and for detour to be constructed on the west side.

Bulloch County, GA 1990
11501 Rotenstein, David S. Archaeological Assessment of Project BHSLB-1077(2), Bibb County

Widen existing 67’ x 19.3’ bridge to a width of 38.’ No wetland involvement, no potentially significant archaeological resources.

Bibb County, GA 1986
11502 Entorf, Robert F. Archaeological Assessment of Project BRZLB-191(2), McIntosh County

Replace bridge on existing alignment with an approximately 24 1 x40 1 concrete bridge. Road would be closed during construction, with no required right-of-way.

McIntosh County, GA 1989
11503 Entorf, Bob P. Archaeological Assessment of Project BRF-133-1(5), Lowndes County

Proposed structure is a triple 8’ x 6’ x 80’ concrete bridge culvert on existing alignment.

Lowndes County, GA 1989
11504 Entorf, Robert F. Archaeological Assessment of Project MR-3707(1), Floyd County

Begin approximately 120 feet southwest of creek and end approximately 150 feet northeast of creek. New structure 67 linear feet of 10’ x 7’ concrete box culvert. Required right of way 40 feet. Easement required for shaping channel. County to provide detour.

Floyd County, GA 1988
11505 Entorf, Robert F. Archaeological Assessment of Project BRF-017-2(47), Floyd County

Begin 1000’ south of bridge and end 1000’ north of bridge. Remove existing 154’ x 24’ bridge and widen existing 154’ x 41’ bridge to 82.’ Required right of way 40.’ Stage construction.

Floyd County, GA 1989
11506 Paglione, Teresa L. Archaeological Assessment of Project BRZLB-145(7), Harris County

No wetland involvement, no displacements, no public water intakes, no potentially significant archaeological resources.

Harris County, GA 1986
11507 Paglione, Teresa L. Archaeological Assessment of Project BRF-134-1(7), Lanier County

A proposed 520’ x 40’ concrete bridge over Big Creek on existing alignment. 800 x 25’ of additional easement on the North side will be needed for a detour. A proposed 280’ x 25’ of additional easement on the south side will be needed for a detour.

Lanier County, GA 1986
11508 Entorf, Robert F. Archaeological Assessment of Project BRF-134-1(8), Lanier County

Existing bridge structure is proposed to be replaced with a 200’ x 40’ concrete bridge on existing alignment. Detour easement 1200’ x 50’ is proposed on the northwest side of the existing roadway. No additional permanent right of way is anticipated to be acquired.

Lanier County, GA 1988
11509 Entorf, Robert F. Archaeological Assessment of Project BRS-1220(4), Lanier County

Bridge over Alapaha River Overflow is proposed to be replaced on existing alignment with a 150 feet x 38 feet concrete bridge structure. Road would be closed during construction as directed by the engineer. Traffic would be maintained on other state routes.

Lanier County, GA 1989