Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
12603 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Incognito Telecommunications Facility in Thomasville

Subterranean Consultants (STC) conducted a Phase I archaeological survey of the proposed lease area and access/utility easement of the proposed Incognito telecommunication facility on October 4, 2018.

Thomas County, GA 2018
12604 Entorf, Robert F. Archaeological Assessment of Project DPU-0004(01) Fulton County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, the proposed project has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP).

Fulton County, GA 1993
12605 Meredith, Steven M. A PHASE I CULTURAL RESOURCES SURVEY FOR PROPOSED WATER MONITORING FACILITIES AT JOSEPH W. JONES ECOLOGICAL CENTER, BAKER COUNTY, GEORGIA

Upon request by RJRudy, LLC, of Ward, Colorado, Panamerican Consultants, Inc. (PCI) of Tuscaloosa, Alabama, performed a Phase I cultural resources survey for the proposed installation of National Ecological Observation Network (NEON) water monitoring facilities at the Joseph W.

Baker County, GA 2017
12606 Duff, Eric Anthony Archaeological Assessment of a District 5 Maintenance Improvement Project (CSSTP-M003-00(828)), Tattnall County

The proposed project on SR 178 would begin at SR 147 (MP 2.79) then continue southeasterly to an end point at SR 121 (MP 14.16). All work will be restricted to within the SR 178 existing right-of-way; no required right-of-way or easements will be needed for project implementation.

Tattnall County, GA 2008
12607 Duff, Eric Anthony Archaeological Assessment of a District 5 Maintenance Improvement Project (CSSTP-M003-00(830)), Tattnall County

The proposed project on SR 121 would begin at the Tattnall/ Appling County line (MP 0.00) then continue northerly to an end point at SR 23 (MP 15.90).

Tattnall County, GA 2008
12608 Duff, Eric Anthony Archaeological Assessment of a District 5 Maintenance Improvement Project (CSNHS-M003-00(857)), Candler and Bulloch Counties

The proposed project on 1-16/SR 404 would begin in Candler County at SR 57/Exit 98 then continue easterly to an end point in Bulloch County at SR 73/Exit 116.

Candler County, GA 2008
12609 Malphurs, Peter Archaeological Assessment of Project F-003-1(19), Douglas County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project F-003-1(19), Douglas County, the proposed project has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of

Douglas County, GA 1984
12610 Bowen, William R. Archaeological Assessment of Project BRF-048-1(24), Richmond County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project BRF-048-1(24), Richmond, the proposed project has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Hist

Richmond County, GA 1984
12611 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Dogwood Telecommunications Facility in Perry

Subterranean Consultants (STC) conducted a Phase I archaeological survey of the proposed lease area and access/utility easement of the proposed Dogwood telecommunication facility on January 16, 2019.

Houston County, GA 2019
12612 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Beachwood Dr. Telecommunications Facility in Jessup

Subterranean Consultants (STC) conducted a Phase I archaeological survey of the proposed lease area and access/utility easement of the Beachwood Dr. telecommunication facility on February 13, 2019.

Wayne County, GA 2019