Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
12579 Bowen, Rachel Third Addendum Phase I Archaeological Survey of Proposed Widening of SR 107/SR 112 from I-75 to SR 181 Thompson Road in Turner County, Georgia

The proposed project would consist of widening a portion of SR 107/SR 112 just east of the city of Ashburn. The project would begin at Interstate 75 (I-75) and extend to CR 181/Thompson Road (Figure 1) for a length of approximately 0.7 mile/3730 feet.

Turner 2019
12580 Hart, Barry D. Project Concept Report BRZLB-207(9) Monroe County

This is a bridge project, BRZLB-207(9), located in Monroe County. The project involves the replacement of the existing structurally deficient and narrow bridge over Tobesofkee Creek on Parks Road/ CR 118 including minor approaches.

Monroe 1985
12581 Braley, Chad O. Bridge Replacement and 404 Permit Requests District Four BR0LB-065(2) Clinch County

In compliance with Sect ion 106 of the National Historic Preservation Act of 1966, archaeological surveys were conducted with the following projects between March 21-23, 1979. The project reported here is BR0LB-065(2) located in Clinch County.

Clinch 1979
12582 O'Connor, Lauren Welch, Pappas, Andrew A. Phase I Archaeological Resources Survey of the Proposed Interstate 20 (I-20) Bridge Replacement Over Big Indian Creek, Morgan County, Georgia

In June 2018, Vanasse Hangen Brustlin, Inc. (VHB) conducted a Phase I archaeological survey of the proposed Interstate 20 (I-20) bridge replacement located in Morgan County, Georgia (PI No. 0014903).

Morgan 2019
12583 Schoeneberg, Erica Archaeological Assessment of Project M000-00(286) Fulton County

Archaeological Assessment of Project M000-00(286), Fulton County Project STP-M000-00(286) consists of the painting of 14 existing bridge structures in Fulton County. No ground disturbance would take place, and this project has no potential to affect and archaeological resources.

Fulton 2000
12584 Perrine, Wesley A. 2nd Addendum Phase I Archaeological Survey of Low Impact Bridge Program, Mt. Airy Road (CR 196) over Ossahatchie Creek in Harris County, Georgia.

The purpose of this project is to replace two structurally deficient steel deck bridges on CR 196/Mt. Airy Road over Ossahatchie Creek in Harris County, Georgia (Figure 1).

Harris 2019
12585 Rotenstein, David S. Bridge Review Sheet BRZLB-239(2) Quitman County

This is a bridge project, BRZLB-239(2), located in Quitman County. The bridge is on CR 29 and crosses Chattahoochee River Tributary. The proposed project will replace the existing structure. The bridge is on the Georgetown city limits.

Quitman 1987
12586 Cook, Lauren Phase I Archaeological Survey for Burnt Hickory Road and Stout Parkway and Brownsville Extension Improvements, Paulding and Cobb counties, Georgia

The proposed project is an intersection improvement project located in the southwest corner of Cobb County along the county line with Paulding County (Figure 1). Burnt Hickory Road runs along the county line here.

Paulding 2019
12587 Bowen, William R. Bridge Categorical Exclusion BRZLB-241(8) Rabun County

This is a bridge project, BRZLB-241(8), located in Rabun County. The bridge is on CR 47/ Old Franklin Highway and crosses Stekoa Creek. The existing structure is a 16-foot-wide by 29-foot-long bridge consisting of steel beams, concrete abutments, and a reinforced concrete deck.

Rabun 1989
12588 McIntosh, Paul Archaeological Assessment of Project SAMA-142(11) Newton County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project SAMA-142(11), Newton County, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP

Newton 2000