Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
12589 Quirk, Phillip W. PHASE I ARCHAEOLOGICAL SURVEY FOR SR 32 OVER 17 MILE RIVER AND OTTER CREEK BRIDGE REPLACEMENTS, COFFEE COUNTY, GEORGIA

On May 9-12, 20 I 6, Edwards-Pitman Environmental, Inc. (EPE [) conducted a Phase I archaeological survey for the proposed State Route (SR) 32 over 17 Mile River and Otter Creek bridge replacement project, in Coffee County, Georgia (Georgia Department of Transportation [GDOT] (P. I. Nos.

Coffee 2017
12590 Alston, Robert L. Bridge Replacement and 404 Permit Requests District Four Bridge Inspections BR0LB-061(1) Clay County

This is a bridge project, BR0LB-061(1), located in Clay County. This project is a part of projects being done in District 4 and the survey methods used were visual inspection of ground surfaces and small shovel tests. The bridge is located near Bluffton, Clay County.

Clay 1979
12591 Sipe, Ryan O. Phase I Archaeological Resources Survey for the Proposed Pedestrian Bridge over SR 21/Augusta Road, Chatham County, Georgia

The proposed project would consist of the design and construction of a pedestrian bridge over State Route (SR) 21 in Port Wentworth. It will also include construction of a sidewalk up to the nearest intersection of Rice Mill Road/SR 21.

Chatham 2016
12592 Koch, Christopher P. Phase I Archaeological Survey of the Proposed SR 369/400 Interchange, Forsyth County, Georgia

The proposed project would construct a new grade-separated, cloverleaf interchange at the existing signalized intersection of SR 369 and SR 400 in Forsyth County, Georgia.

Forsyth 2016
12593 West Point Project: Summary of Work Accomplished

Basing on the "Summary proposal for the West Point Area Salvage Program for 1969," previously submitted, the present review will follow the same outline.

Troup 1969
12594 Bruce-Vaughters, Rebecca E. A Cultural Resources Survey for the Nancytown North Timber Sale Chattooga River Ranger District, Habersham and Stephens Counties, Georgia

A cultural resource survey and review has been completed for 272 acres of the Chattahoochee National Forest. A total of 156 acres of the 272 acres were surveyed for the current project.

Habersham 2018
12595 Abbott, David Pleasant Hill Road Widening at Chattahoochee River

The Pleasant Hill Road Widening at Chattahoochee River to McClure Bridge Road project is a Gwinnett County Department of Transportation project (P.I. No. F-0035) with the overall purpose of expanding the existing road to alleviate increased traffic flow.

Gwinnett 2005
12596 Entorf, Robert F. Bridge Categorical Exclusion, BRF-062-1(12) Johnson County

This is a bridge project, BRF-062-1(12), located in Johnson County. The bridge is on SR 57 and crosses Buckeye Creek and Ohoopee River. The existing structures are 23.8 feet by 100 feet and 23.8 feet by 400 feet. Both structures are timber, steel, and concrete bridges.

Johnson 1990
12597 D'Avino, Gail A., Entorf, Robert F. Project IM-MS(194) Bartow/Cherokee Counties, Proposed Bridge Painting

Project IM- MS(l94), Bartow/Cherokee Counties: Proposed Bridge Painting: the proposed project consists of the painting of bridges at fourteen locations (see attached maps).

Bartow 1997
12598 Alston, Robert L. Bridge Replacements and 404 Permit Requests District six BRZLB-055(2) Chattooga County

In compliance with Section 106 of the National Historic Preservation Act of 1966, the following bridge projects were surveyed for archaeological material. The bridge in this report was BRZLB-055(2) located in Chattooga County.

Chattooga 2019