Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
12569 Perrine, Wesley A. Addendum Phase I Archaeological Survey of Buffington Road Between SR 14/Roosevelt Highway and Interstate 85, Fulton County, Georgia

The purpose of this project is to widen and add turn lanes to Buffington Road between Interstate (I-) 85 and State Route (SR) 14/Roosevelt Highway in Fulton County, Georgia.

Fulton 2018
12570 Gresham, Thomas H., Braley, Chad O. Archeological Delineation of the Georgia State Penitentiary Cemetery, Cedar Creek Tap 115 kV Transmission Line, Milledgeville, Baldwin County, Georgia

Georgia Transmission Corporation (GTC) wishes to improve the existing Cedar Creek Tap 115 kV transmission line on the northwestern edge of Milledgeville in Baldwin County (Figures 1 and 2).

Baldwin 2016
12571 Falvey, Lauren W. Phase I Archaeological Survey of Proposed Drainage Improvements on Interstate 75 Northbound at Peachtree Creek, Atlanta, Fulton County, Georgia

The project is located on Interstate 75 (I-75) at Peachtree Creek in Atlanta, Fulton County, Georgia. The proposed project would replace the existing washed out drainage 36” RCP pipe discharging along the southern bank of Peachtree Creek along the northbound outside shoulder of I-75.

Fulton 2017
12572 Joseph, Joseph W., Keith, Scot J., DeVore, Pam Enlow Phase I Archaeological Survey of Vernon View

On behalf of the Georgia Department of Natural Resources’ Historic Preservation Division, New South Associates, Inc. conducted a Phase I Archaeological Survey of a 1.06-acre parcel located at 306B McAlpin Drive in Savannah, Chatham County, Georgia.

Chatham 2018
12573 Trudeau, Mary F. Phase I Archaeological Survey for Intersection and Operational Improvements and Pedestrian Accommodations along North Parkway, Interstate North Cirde, and Windy Ridge Parkway, Cobb County, Georgia

The proposed project includes intersection and operational improvements and pedestrian accommodations along Interstate North Parkway, Interstate North Circle, and Windy Ridge Parkway, including the following: Intersection improvements at Interstate North Parkway and Interstate North Circl

Cobb 2016
12574 Entorf, Robert F. Archaeological Assessment of Project BRS-2723(2), Clinch County

The existing bridge structure would be replaces with a 160’ x 38’ concrete bridge structure on existing alignment. An on-site runaround detour would be provided on the east (right) side of the existing bridge. No additional right of way or temporary easement would be required.

Clinch 1989
12575 Rotenstein, David S. Archaeological Assessment of Project BRZLB-019(3), Berrien County

A proposed 10’ x 6’ x 36’ concrete box culvert will be replaced on existing alignment. Approximately 80’ of additional right of way will be needed. This road will be closed during construction.

Berrien 1985
12576 Duff, Eric Anthony Archaeological Assessment of a District 4 Resurfacing Project (CSSTP-M003-00(799)), Clay County

The proposed project on SR 1 would begin at the Early/Clay County line (MP 0.00) then continue northerly to an end point approximately 965 feet south of CR 20 (MP 2.64). All work will be restricted to within the existing right-of-way.

Clay 2007
12577 Duff, Eric Anthony Archaeological Assessment of a District 5 Maintenance Improvement Project (CSSTP-M003-00(826)), Effingham County

The proposed project on SR 119 would begin approximately 500-foot north of Priester Road (MP 16.90) then continue northerly to an end point at the bridge over the Savannah River (MP 21.91).

Effingham 2008
12578 Duff, Eric Anthony Archaeological Assessment of a District 5 Maintenance Improvement Project (CSSTP-M003-00(827)), Jeff Davis County

The proposed project on SR 27 would begin approximately 185 feet east of the divided median that is 0.36 mile east of CR 180 (Dr Turfier Road-MP 8.885) then continue southeasterly to an end point at the Jeff Davis/ Appling County line (MP 11.419).

Jeff Davis 2008