Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
12573 Trudeau, Mary F. Phase I Archaeological Survey for Intersection and Operational Improvements and Pedestrian Accommodations along North Parkway, Interstate North Cirde, and Windy Ridge Parkway, Cobb County, Georgia

The proposed project includes intersection and operational improvements and pedestrian accommodations along Interstate North Parkway, Interstate North Circle, and Windy Ridge Parkway, including the following: Intersection improvements at Interstate North Parkway and Interstate North Circl

Cobb County, GA 2016
12574 Entorf, Robert F. Archaeological Assessment of Project BRS-2723(2), Clinch County

The existing bridge structure would be replaces with a 160’ x 38’ concrete bridge structure on existing alignment. An on-site runaround detour would be provided on the east (right) side of the existing bridge. No additional right of way or temporary easement would be required.

Clinch County, GA 1989
12575 Rotenstein, David S. Archaeological Assessment of Project BRZLB-019(3), Berrien County

A proposed 10’ x 6’ x 36’ concrete box culvert will be replaced on existing alignment. Approximately 80’ of additional right of way will be needed. This road will be closed during construction.

Berrien County, GA 1985
12576 Duff, Eric Anthony Archaeological Assessment of a District 4 Resurfacing Project (CSSTP-M003-00(799)), Clay County

The proposed project on SR 1 would begin at the Early/Clay County line (MP 0.00) then continue northerly to an end point approximately 965 feet south of CR 20 (MP 2.64). All work will be restricted to within the existing right-of-way.

Clay County, GA 2007
12577 Duff, Eric Anthony Archaeological Assessment of a District 5 Maintenance Improvement Project (CSSTP-M003-00(826)), Effingham County

The proposed project on SR 119 would begin approximately 500-foot north of Priester Road (MP 16.90) then continue northerly to an end point at the bridge over the Savannah River (MP 21.91).

Effingham County, GA 2008
12578 Duff, Eric Anthony Archaeological Assessment of a District 5 Maintenance Improvement Project (CSSTP-M003-00(827)), Jeff Davis County

The proposed project on SR 27 would begin approximately 185 feet east of the divided median that is 0.36 mile east of CR 180 (Dr Turfier Road-MP 8.885) then continue southeasterly to an end point at the Jeff Davis/ Appling County line (MP 11.419).

Jeff Davis County, GA 2008
12579 Bowen, Rachel Third Addendum Phase I Archaeological Survey of Proposed Widening of SR 107/SR 112 from I-75 to SR 181 Thompson Road in Turner County, Georgia

The proposed project would consist of widening a portion of SR 107/SR 112 just east of the city of Ashburn. The project would begin at Interstate 75 (I-75) and extend to CR 181/Thompson Road (Figure 1) for a length of approximately 0.7 mile/3730 feet.

Turner County, GA 2019
12580 Hart, Barry D. Project Concept Report BRZLB-207(9) Monroe County

This is a bridge project, BRZLB-207(9), located in Monroe County. The project involves the replacement of the existing structurally deficient and narrow bridge over Tobesofkee Creek on Parks Road/ CR 118 including minor approaches.

Monroe County, GA 1985
12581 Braley, Chad O. Bridge Replacement and 404 Permit Requests District Four, BR0LB-065(2), Clinch County

In compliance with Sect ion 106 of the National Historic Preservation Act of 1966, archaeological surveys were conducted with the following projects between March 21-23, 1979. The project reported here is BR0LB-065(2) located in Clinch County.

Clinch County, GA 1979
12582 O'Connor, Lauren Welch, Pappas, Andrew A. Phase I Archaeological Resources Survey of the Proposed Interstate 20 (I-20) Bridge Replacement Over Big Indian Creek, Morgan County, Georgia

In June 2018, Vanasse Hangen Brustlin, Inc. (VHB) conducted a Phase I archaeological survey of the proposed Interstate 20 (I-20) bridge replacement located in Morgan County, Georgia (PI No. 0014903).

Morgan County, GA 2019