12549 Price, George D. Phase I Cultural Resources Survey of Proposed Transmission Line Reroute near Arlington, Calhoun County, Georgia

Apalachee Research Archaeological Consultants Inc. contracted with Pilot Environmental Inc. to complete cultural resource investigations in compliance with Section 106 of the National Historic Preservation Act and its implementing regulations 36CFR800.

Calhoun 2019
12550 Butler, C. Scott Background Research and Phase I Site Delineation of John Lamar's Fairfield Plantation (9PM2438), Putnam County, Georgia

During December 16-31, 2017, Brockington and Associates. Inc. completed background research and an archaeological site delineation for Fairfield Plantation, a circa 1810 home originally constructed for John Lamar (1769-1833) and his wife Rebecca Lamar (1774-1839).

Putnam 2017
12551 McIntosh, Paul Archaeological Assessment of Project IM-00MS(268) Newton County Interstate Ramp Improvements and Rehabilitation Along Interstate 20

Georgia Project IM-00MS(268), Newton County, proposes to rehabilitate and reconstruct the existing interchange ramps, replacement of the existing bridge overpasses, and upgrade the ramp/cross street intersections of three intersections along lnterstate-20 in Newton County.

Newton 2000
12552 McIntosh, Paul Archaeological Assessment of Project STP-M000-00(396) Newton County

Georgia Project STP-M000-00(396), Newton County proposes to construct 2-ft. paved shoulders, on a portion of State Route 212 in Newton County. The proposed project would consist of the construction of 0.60 m (2 ft.) paved shoulders, left and right.

Newton 2000
12553 Duff, Eric Anthony Archaeological Assessment of a District 4 Resurfacing Project CSSTP-M003-00(801) Grady County

Archaeological Assessment of a District 4 Resurfacing Project, the proposed project would consist of shoulder paving/building, permanent marking placement, and resurfacing on SR 188 in Grady County. The proposed project on SR 188 would begin at 12th Avenue in Cairo (MP 1.

Grady 2007
12554 Duff, Eric Anthony Archaeological Assessment of Project CSSTP-0007-00(670) Paulding County

In compliance with Section I 06 of the National Historic Preservation Act of 1966 and amendments thereto, project CSSTP-0007-00(670), Paulding County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Plac

Paulding 2006
12555 Duff, Eric Anthony Archaeological Assessment of a District 4 Resurfacing Project CSNHS-M003-00(802) Terrell County

Archaeological Assessment of a District 4 Resurfacing Project; the proposed project would consist of mainline milling, leveling, and resurfacing, on SR 32 in Terrell County.

Terrell 2007
12556 Edwards, Mark R., Scott, Walker, Studstill, David E. Projects STP-OOMS(217)(218), Chatham, McIntosh, Glynn and Camden Counties

The proposed project consists of the replacement of old, structurally inadequate fender systems on five bridges. The existing fender systems, which protect the bridge substructures, cannot withstand too many more collisions.

Chatham 1997
12557 Schoeneberg, Erica Archaeological Assessment of Project STP-M000-00(148), Glynn County

In compliance with Section I 06 of the National Historic Preservation Act of 1966 and amendments thereto, project STP-M000-00(148) in Glynn County, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places

Glynn 1999
12558 Entorf, Robert F. Archaeological Assessment of Project BRF-030-4(15), Tattnall County

Replace existing alignment with an approximately 44’x1200’ concrete bridge; reconstruct approaches from approximately 1100 feet before to approximately 1100 past the existing bridge; No additional R/W or easement required; road to be closed during construction with traffic detoured to area roadwa