12683 Bowen, Rowe Archaeological Assessment of Project BRF-090-2(8), Johnson County

Big Cedar creek-40’ x 250’ concrete bridge. A temporary detour with easement in required in the downstream side. Little Cedar creek- double 10’ x 8’ concrete bridge culvert. A temporary detour easement is required on the down stream side.

Johnson County, GA 1986
12684 Bowen, William R. Archaeological Survey and Assessment of County Bridge Project, District Five, BRO-0179(1), Liberty County

The survey entailed examination of relevant survey reports, project plans, maps, and site files, and a pedestrian (walk­through) survey of the entire project, occasionally complemented by periodic placement of subsurface tests where needed.

Liberty County, GA 1979
12685 Bowen, William R. Archaeological Survey and Assessment of County Bridge Project, District Four, BRO-0277(1), Tift County

The survey entailed examination of relevant survey reports, project plans, maps, and site files, and a pedestrian (walk­through) survey of the entire project, occasionally complemented by periodic placement of subsurface tests where needed.

Tift County, GA 1979
12686 Bowen, William R. Archaeological Survey and Assessment of County Bridge Project, District Four, BRO-0019(1), Berrien County

The survey entailed examination of relevant survey reports, project plans, maps, and site files, and a pedestrian (walk­through) survey of the entire project, occasionally complemented by periodic placement of subsurface tests where needed.

Berrien County, GA 1979
12687 Vargas, Jessica, DuBois, Autumn Proposed 150-Foot Monopole Communications Structure (163-Foot Overall Height Including Appurtenances) Woodvalley Substation, Gornto Road, Valdosta, Lowndes County, Georgia

Environmental Corporation of America’s (ECA) client, Georgia Power Company, is proposing to construct a communications facility as described in the following FCC Form 620, New Tower (NT) Submission Packet.

Lowndes County, GA 2015
12688 Falvey, Lauren W. Phase I Archaeological Survey of Proposed Resurfacing along State Route 3 in Taylor County, Georgia

The proposed work consists of resurfacing, patching, milling, striping, raised pavement markers, and curb cuts for wheelchair ramps along a 13.807-mile section of State Route (SR) 3 from SR 96 to the Flint River Bridge/Upson County line in Taylor County, Georgia (Figure I).

Taylor County, GA 2018
12689 Perrine, Wesley A. Phase I Archaeological Survey of Proposed Resurfacing along State Route 27 EA (Lamar Street) and State Route 27WE (Forsyth Street) in Sumter County, Georgia

The proposed work will take place along a 2.107-mile section of State Route (SR) 27 EA (Lamar Street) and a 2.062 mile section of SR 27 WE (Forsyth Street) from SR 3/US 19 to the intersection of SR 30 in Americus, Sumter County Georgia (Figure l).

Sumter County, GA 2013
12690 Archaeological Assessment of Project F-055-1(29), Banks County

2-mile new location project which begins at County Road 180 and US 441 and continues in a Northwesterly direction to SR 15/198 just south of CR 183. An intensive survey should be conducted when plows and made available.

Banks County, GA
12691 Archaeological Assessment of Project BRZLB-071(17), Colquitt County

This project is the replacement of the bridges over the Ochlocknee River and Overflow on CR 297 (Swift Canteen Road). The entire project area is within an extensive wetland, enhanced by the recent passing of Hurricane Kate.

Colquitt County, GA 1985
12692 Crawford, Peggy L. Archaeological Assessment of Project BRZLB-073-1(1), Columbia County

This is a bridge replacement project over Uchee Creek along CR 258. The existing bridge will be replaced with a culvert.