Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
12723 Archaeological Assessment of Project STP-2584(7), Rockdale County

The interaction of SR 20 and Pleasant Hill will be relocated; SR 20 would be realigned to intersect with Pleasant Hill Rd. on new alignment south of the present intersection. An estimated 100 ft. of ROW would be required.

Rockdale County, GA 1994
12724 Rotenstein, David S. Archaeological Assessment of Project BRZLB-037(30, Calhoun County

This is the replacement of the bridge on CR 60 over Bay Branch with a culvert. There is an extensive wetland on NW ¼ with the SW side being extremely low and apparently wet.

Calhoun County, GA 1985
12725 Fleming, Sherry, Entorf, Bob P. Archaeological Assessment of STP-162-1(17), Fayette County

"In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, STP-162-1 (17), Fayette County has been surveyed with respect to archaeolog1cal resources, espec1ally those on or eligible for inclusion 1n the National Register of Historic Places (NRHP).

Fayette County, GA 1998
12726 Hart, Barry D. Archaeological Assessment of Project F-114-1(39), Cobb County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project F-114-1(39), Cobb County, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP).

Cobb County, GA 1983
12727 Bowen, William R. Archaeological Survey and Assessment of County Bridge Project, District Four, BRO-0071(1), Colquitt County

In compliance with Section 106 of the National Historic Preservation Act of 1966, the following projects were sur­veyed with respect to archaeological resources; especially those which may be eligible for inclusion in the National Register of Historic Places (NRHP).

Colquitt County, GA 1979
12728 Brummeler, Charles K. Phase I Archaeological Survey for the Bridge Replacement of SR 376 over the Alapohoochee River, Echols County, Georgia

The proposed project would replace the existing two-lane bridge on State Route (SR) 376 over the Alapohoochee River between the towns of Statenville and Lake Park with a new bridge consisting of two 12-foot lanes and 8-foot shoulders.

Echols County, GA 2018
12729 Blackwelder, Jon R. Fourth Addendum Phase I Archaeological Survey for an Interchange Improvement at Interstate 75 and County Road 274/Bellville Road, Lowndes County, Georgia

CR 274/Bellville Road is functionally classified as a rural major collector and is presently a two-lane rural facility with an existing speed limit of 45 miles per hour (mph). At this interchange, I-75 is classified as a rural interstate with a diamond interchange.

Lowndes County, GA 2018
12730 Hitt, Kaitlen Phase I Archaeological Survey for SR 180 Bridge Replacement over Slaughter Creek, Union County, Georgia

The purpose of project CSBRG-0007-00(055) is to replace the existing bridge on State Route (SR) 180 over Slaughter Creek in Union County, 9.5 miles south of Blairsville. The existing bridge was constructed in 1931 and has a sufficiency rating of 56.4.

Union County, GA 2018
12731 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Desmond Telecommunications Facility in Dexter

Subterranean Consultants (STC) conducted a Phase I archaeological survey of the proposed lease area and access/utility easement of the Desmond telecommunication facility on June 20, 2018.

Laurens County, GA 2018
12732 Lowrey, Jonathan D. Second Addendum to a Phase I Archaeological Survey of the SR 54 Pedestrian Bridge and Trail, Fayette County, Georgia

The proposed project would provide a shared-use trail and an above-grade pedestrian bridge on SR 54 in Fayette County (Figure 1). No trail or bridge exists at this location currently.

Fayette County, GA 2018