12669 Entorf, Robert F. Archaeological Assessment of Project BRF-090-2(12), Montgomery County

Replace on existing alignment at Bear Creek with two double 9'x7' culverts and at Big Cypress Creek with a triple 9'x6' culvert. No required RM: Easement required on the east and the west side respectively for a detour.

Montgomery 1989
12670 Hall, Robin Archaeological Assessment of Project BRZLB-071(14), Colquitt County

This project is the replacement of the bridge of CR 481 over Little Creek. The area is a low density farming community with fields adjacent to all quarters of the project. There is a wetland in the S/W ¼ of the project.

Colquitt 1985
12671 Bowen, William R. Archaeological Assessment of Project BHS-2941(2), Dade County

Widening existing bridges over Lookout Creek and southern Railroad. 224.75’ x 44’ concrete steel Bridge 139.8’ x 44’ concrete steel bride. Required right of way is 50.’

Dade 1986
12672 McCarley, Billy J. Phase I Archeological Survey of the Proposed Seminole County Tower Telecommunications Facility in Donalsonville, Seminole County, Georgia

Subterranean Consultants (STC) conducted a Phase I archaeological survey of the Seminole County Tower telecommunication facility compound and (3) guy anchors on August 8, 2019. The project area is in central Seminole County in Donalsonville, Georgia.

Seminole 2019
12673 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Trojans Telecommunications Facility in Fort Valley, Peach County, Georgia

Subterranean Consultants (STC) conducted a Phase I archaeological survey of the proposed lease area and access/utility easement of the Trojans telecommunication facility on January 29, 2019.

Peach 2019
12674 Pietak, Lynn Marie Phase I Archaeological Survey for SR 16 at the Flint River, Bridge 255-0012-0, Spalding County, Georgia

The project proposes to replace Bridge # 255-0012-0 on State Road (SR) 16 over the Flint River in Spalding County, located 8 miles west of Griffin, Georgia and about 3.3 miles southeast of Brooks, Georgia (Figure 1).

Spalding 2018
12675 Hahs, David G. Phase I Archaeological Survey for the SR 42 at NS#718418R Bridge Replacement, Henry County, Georgia

The bridge on SR 42 (US 23) over Norfolk Southern Railroad, Structure ID 151-0009-0, was built in 1938 and widened in 1979. This bridge consists of eight (8) spans of steel beams on concrete caps with concrete columns in the approach spans and steel caps with concrete columns in the main spans.

Henry 2018
12676 Butler, C. Scott, Reynolds, Michael W. Phase I Cultural Resources Survey Timberbrook Tract, Phase II Testing Site 9CW453 and 9CW454

From July 24 through July 28, 2017, Brockington and Associates, Inc.

Coweta 2018
12677 Pietak, Lynn Marie Phase I Archaeological Survey for the SR 136@ Toto Creek Bridge (No. 085-0019-0) Replacement, Dawson County, Georgia

Georgia Department of Transportation (GDOT) P.1. No. 0013990 would replace the existing State Route (SR) 136 bridge over Toto Creek/Lake Lanier located approximately 7.6 miles southeast of the City of Dawsonville. The existing bridge is 272 feet long and has a total deck width of 26.8 feet.

Dawson 2018
12677 Sipe, Ryan O. Phase I Archaeological Survey of the Proposed SR 122 Bridge Replacement over Mule Creek, Brooks County, Georgia

This project will replace the existing bridge on SR 122 over Mule Creek, which is 2 miles east of Pavo, with a new bridge using two 12-foot lanes and 6-foot shoulders on both sides. The roadway section will include two 12-foot lanes with 6-foot rural shoulders (2-feet paved, 4-feet grassed).

Brooks 2018