12673 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Trojans Telecommunications Facility in Fort Valley, Peach County, Georgia

Subterranean Consultants (STC) conducted a Phase I archaeological survey of the proposed lease area and access/utility easement of the Trojans telecommunication facility on January 29, 2019.

Peach County, GA 2019
12674 Pietak, Lynn Marie Phase I Archaeological Survey for SR 16 at the Flint River, Bridge 255-0012-0, Spalding County, Georgia

The project proposes to replace Bridge # 255-0012-0 on State Road (SR) 16 over the Flint River in Spalding County, located 8 miles west of Griffin, Georgia and about 3.3 miles southeast of Brooks, Georgia (Figure 1).

Spalding County, GA 2018
12675 Hahs, David G. Phase I Archaeological Survey for the SR 42 at NS#718418R Bridge Replacement, Henry County, Georgia

The bridge on SR 42 (US 23) over Norfolk Southern Railroad, Structure ID 151-0009-0, was built in 1938 and widened in 1979. This bridge consists of eight (8) spans of steel beams on concrete caps with concrete columns in the approach spans and steel caps with concrete columns in the main spans.

Henry County, GA 2018
12676 Butler, C. Scott, Reynolds, Michael W. Phase I Cultural Resources Survey Timberbrook Tract, Phase II Testing Site 9CW453 and 9CW454

From July 24 through July 28, 2017, Brockington and Associates, Inc.

Coweta County, GA 2018
12677 Pietak, Lynn Marie Phase I Archaeological Survey for the SR 136@ Toto Creek Bridge (No. 085-0019-0) Replacement, Dawson County, Georgia

Georgia Department of Transportation (GDOT) P.1. No. 0013990 would replace the existing State Route (SR) 136 bridge over Toto Creek/Lake Lanier located approximately 7.6 miles southeast of the City of Dawsonville. The existing bridge is 272 feet long and has a total deck width of 26.8 feet.

Dawson County, GA 2018
12677 Sipe, Ryan O. Phase I Archaeological Survey of the Proposed SR 122 Bridge Replacement over Mule Creek, Brooks County, Georgia

This project will replace the existing bridge on SR 122 over Mule Creek, which is 2 miles east of Pavo, with a new bridge using two 12-foot lanes and 6-foot shoulders on both sides. The roadway section will include two 12-foot lanes with 6-foot rural shoulders (2-feet paved, 4-feet grassed).

Brooks County, GA 2018
12679 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Berrien Telecommunications Facility in Alapaha

Subterranean Consultants (STC) conducted a Phase I archaeological survey of the Berrien telecommunication facility lease area and access/utility easement on May 27, 2019. The project area is in northern Berrien County in Alapaha, Georgia.

Berrien County, GA 2019
12680 Kirkland, S. Dwight 2018 PHASE I ARCHAEOLOGICAL SURVEY OF THE PROPOSED RACETRAC PROJECT #1294-KINGS BAY, CAMDEN COUNTY, GEORGIA

On April 7, 2018, Southeastern Horizons, Inc.

Camden County, GA 2018
12681 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Le Gillis Telecommunications Facility in Uvalda

Subterranean Consultants (STC) conducted a Phase I archaeological survey of the proposed lease area and access/utility easement of the Lee Gillis telecommunication facility on January 25, 2019.

Montgomery County, GA 2019
12682 Entorf, Robert F. Archaeological Assessment of Project F-178-1(26), Polk/Paulding Counties

This is a reevaluation of the realignment of a portion of SR 6/US 278 between Rockmart and Dallas (see map). A short portion of the project was walked southeast of CR 131. This is an extremely steep relief and very low site probability.

Polk County, GA