Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
12803 Southerlin, Bobby G. Archaeological Evaluation of the Riverside Court and Park Court Gas Service Lines Cartersville, Georgia

During May 2005, Archaeological Consultants of the Carolinas, Inc. (ACC), conducted an archaeological evaluation of proposed gas service lines in Cartersville Georgia.

Bartow County, GA 2005
12804 Erickson, Luke W. Archaeological Assessment of Project CSSTP-M002-00(420) Clarke, Oconee, and Union Counties

Archeological Assessment of Project CSSTP-M002-00(420), Clarke, Oconee, and Union Counties. This project involves the removal and replacement of various joint systems in bridge structures located within District l.

Clarke County, GA 2003
12805 Brummeler, Charles K., Moss, Richard A. FIFTH ADDENDUM PHASE I ARCHAEOLOGICAL SURVEY FOR PROPOSED GRADE SEPARATION OF SR 316/US 29 AT SR 11, BARROW COUNTY, GEORGIA

The fifth addendum Phase I archaeological survey for the proposed Georgia Department of Transportation (GDOT) project to build a grade separated interchange of State Route (SR) 316/United States Highway (US) 29 at SR 11 in Barrow County, Georgia (GDOT Project No. CSNHS-0008-00 [ 430], Pl No.

Barrow County, GA 2019
12806 McMahon, Patricia, Keith, Scot J. Phase I Archaeological Survey of State Road 17 at Blue Jay Road

On behalf of Atkins North America (Atkins) and the Georgia Department of Transportation (GDOT), New South Associates (NSA) conducted a Phase I Archaeological Survey of the proposed intersection improvements at State Road (SR) 17 and Blue Jay Road in Effingham County, Georgia.

Effingham County, GA 2019
12807 Bowen, William R. Archaeological Surveys of County Bridge Projects—All Districts, Project N-AD-20-1(3) Camden County

Georgia DOT Project # N-AD-20-1(3) is an in-place bridge replacement project at St. Mary’s street bridge at Tidal Creek in Camden County. Because the project is in-place, no new areas will be impacted. Only those areas which have been disturbed by previous bridge construction will be affected.

Camden County, GA 1979
12808 Moss, Richard A., Sipe, Ryan O. Geophysical Survey Report for Addendum Phase I Archaeological Survey of Atlanta Beltline Southside Trail, Fulton County, Georgia

On October 10, 2016, Edwards-Pitman Environmental, Inc. (EPEI) conducted a supplemental ground penetrating radar (GPR) investigation in order to further investigate buried historic streetcar resources potentially affected by Atlanta BeltLine, Inc.’s (ABI’s) proposed Southside Trail (Figure 1).

Fulton County, GA 2016
12809 Williams, Siska, Perrine, Wesley A. Archaeological Assessment of Two Surplus Parcels in Jones County, Georgia

The proposed project consists of the transfer of two surplus property parcels currently owned by GDOT. An interested member of the public has contacted GDOT’s Right-Of-Way office requesting to purchase these two surplus land parcels from GDOT.

Jones County, GA 2019
12810 Pappas, Andrew A., Hanks, Matthew L. A Phase I Archaeological Resources Survey of the Proposed South Atlanta Street (SR 9) “Historic Gateway” Corridor Improvements, Fulton County, Georgia

In December 2012, January 2013, April 2015, and June of 2015, AECOM Corporation conducted a Phase I archaeological survey of the proposed 1.3-mile South Atlanta Street (State Route [SR] 9) “Historic Gateway” corridor improvements, which is associated with the GDOT project STP00-9496-00(001), P.I.

Fulton County, GA 2016
12811 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Church Hill Telecommunications Facility in Preston, Webster County, Georgia

Subterranean Consultants (STC) conducted a Phase I archaeological survey of the proposed lease area and access/utility easement of the Church Hill telecommunication facility on March 9, 2019.

Webster County, GA 2019
12812 McCarley, Billy J. Phase I Archaeological Survey of the Proposed Livestock Telecommunications Facility in Carrollton, Carroll County, Georgia

Subterranean Consultants (STC) conducted a Phase I archaeological survey of the proposed lease area and access/utility easement of the Livestock telecommunication facility on March 4, 2019.

Carroll County, GA 2019