Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
12799 Stanfield, Tal Project STP-005-5(41), Bulloch County: Proposed Paving of Shoulders Along SR 26/US 80 from the SR 119 Connector to the Bryan County Line

The proposed project consists of the paving of shoulders along SR 26/US 80 from the SR 119 Connector to the Bryan County Line (see attached map). Total project length is approximately 13 kilometers (8 miles).

Bulloch 1997
12800 Bowen, William R. Archaeological Assessment of Project F-035-1(20), Henry County

Richard Warner of HPS called yesterday and said that a Mr. James Berry of Stockbridge called and said that we were going to impact an old stone wall built by slaves. The project is S.R. 138 widening at Honey Creek. Teresa met Mr.

Henry 1991
12801 Sanchez, Eric Archaeological Records Check & Phase IA Archaeological Reconnaissance for the Proposed Enigma Telecommunications Tower Site in Berrien County, Georgia

In response to a request from Ignite Wireless, Inc., RESCOM Environmental Corp., has completed a Phase Ia archaeological reconnaissance and records check for a proposed telecommunications tower site in Berrien County, Georgia (Figure 1).

Berrien 2019
12802 Shirk, Elizabeth C. GDOT Project MSL-0000-00(737) DeKalb County

The proposed project would consist of improvements in North Dekalb County along 0.54 miles of East Roxboro Road from southwest of North Druid Hills north to Rockhaven Circle.

DeKalb 2003
12803 Southerlin, Bobby G. Archaeological Evaluation of the Riverside Court and Park Court Gas Service Lines Cartersville, Georgia

During May 2005, Archaeological Consultants of the Carolinas, Inc. (ACC), conducted an archaeological evaluation of proposed gas service lines in Cartersville Georgia.

Bartow 2005
12804 Erickson, Luke W. Archaeological Assessment of Project CSSTP-M002-00(420) Clarke, Oconee, and Union Counties

Archeological Assessment of Project CSSTP-M002-00(420), Clarke, Oconee, and Union Counties. This project involves the removal and replacement of various joint systems in bridge structures located within District l.

Clarke 2003
12805 Brummeler, Charles K., Moss, Richard A. FIFTH ADDENDUM PHASE I ARCHAEOLOGICAL SURVEY FOR PROPOSED GRADE SEPARATION OF SR 316/US 29 AT SR 11, BARROW COUNTY, GEORGIA

The fifth addendum Phase I archaeological survey for the proposed Georgia Department of Transportation (GDOT) project to build a grade separated interchange of State Route (SR) 316/United States Highway (US) 29 at SR 11 in Barrow County, Georgia (GDOT Project No. CSNHS-0008-00 [ 430], Pl No.

Barrow 2019
12806 McMahon, Patricia, Keith, Scot J. Phase I Archaeological Survey of State Road 17 at Blue Jay Road

On behalf of Atkins North America (Atkins) and the Georgia Department of Transportation (GDOT), New South Associates (NSA) conducted a Phase I Archaeological Survey of the proposed intersection improvements at State Road (SR) 17 and Blue Jay Road in Effingham County, Georgia.

Effingham 2019
12807 Bowen, William R. Archaeological Surveys of County Bridge Projects—All Districts, Project N-AD-20-1(3) Camden County

Georgia DOT Project # N-AD-20-1(3) is an in-place bridge replacement project at St. Mary’s street bridge at Tidal Creek in Camden County. Because the project is in-place, no new areas will be impacted. Only those areas which have been disturbed by previous bridge construction will be affected.

Camden 1979
12808 Moss, Richard A., Sipe, Ryan O. Geophysical Survey Report for Addendum Phase I Archaeological Survey of Atlanta Beltline Southside Trail, Fulton County, Georgia

On October 10, 2016, Edwards-Pitman Environmental, Inc. (EPEI) conducted a supplemental ground penetrating radar (GPR) investigation in order to further investigate buried historic streetcar resources potentially affected by Atlanta BeltLine, Inc.’s (ABI’s) proposed Southside Trail (Figure 1).

Fulton 2016