13240 Howell, Annamarie, Beazley, Matthew Section 106 Review: TCNS ID 184365 – Proposed 305-Foot Guyed Type Telecommunications Structure (Overall Height Including Appurtenances)

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Meriwether County, GA 2019
13241 Perryman, Jakob, DuBois, Autumn Section 106 Review TCNS ID 175348 Proposed 307-Foot Tall Self-Supporting Lattice Telecommunications Structure (317-Foot Overall Height Including Appurtenances)

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Gilmer County, GA 2018
13242 Jones, Conchita, DuBois, Autumn Section 106 Review TCNS ID 174421 Proposed 250-Foot Self-Support Telecommunications Structure (270-Foot Overall Height with Appurtenances)

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Camden County, GA 2018
13243 Horne, Zach Cultural Resources Survey of the “LAX - A” Self-Support Tower Telecommunication Facility, Ocilla, Irwin County, Georgia

In April 2019, Trileaf Corporation (Trileaf) performed a cultural resource inventory survey for a proposed self-support tower telecommunication facility located in Irwin County, Ocilla, Georgia (Latitude: 31° 28’ 29.83” Longitude: 83° 07’ 16.31”).

Irwin County, GA 2019
13244 Wilkerson, John M. Archaeological Assessment of Project F-117-1, Richmond County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, the project has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP).

Richmond County, GA 1966
13245 Humphrey, Robert E. Archaeological Assessment of Project FR-030-2(23), Crisp County

On S.R. 30/U.S. 280 in Crisp County and additional 12' lane will be constructed from milepoint 14.7 to milepoint 16.2, and a westbound passing lane will be constructed from milepoint 17.0 to milepoint 18.5. A total distance of three miles.

Crisp County, GA 1991
13246 D'Avino, Gail A., Bowen, Rowe Project STP-001-4(61), Lamar/Pike/Spalding Counties: Determination of No Undertaking

The subject project would consist of the leveling and resurfacing of SR 7 through Lamar, Pike, and Spalding Counties. The proposed project would begin at the intersection of Redbud Drive in Lamar County and would end at the intersection of SR 3 in Spalding County.

Lamar County, GA 1997
13247 Crawford, Peggy L. Archaeological Assessment of Project BRZLB-089(1), Dekalb County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, the project has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP).

DeKalb County, GA 1982
13248 Gresham, Thomas H. An Archeological Survey of the Proposed Ivy Creek 115kV Transmission Line, Gwinnett County, Georgia

This report presents the results of an intensive archeological survey of a proposed 6.5 km (4.1 mi) long electrical transmission line in northern Gwinnett County that the Georgia Transmission Corporation wishes to construct.

Gwinnett County, GA 1999
13248 Bowen, Rowe Archaeological Survey of Carrollton Bypass Project, Carroll County

This is a survey for a proposed borrow pit within the rights of way of the proposed Carrollton By-Pass north of SR 166. The area to be borrowed is a 14 acre tract which is already owned by the state and fenced.

Carroll County, GA 1980