Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
13255 Blackwelder, Jon R. Phase I Archaeological Survey for the Proposed Infantry Road and Follow Me Multi-Use Trail Project, Muscogee County, Georgia

The proposed project would consist of the construction of a new alignment roadway, Infantry Road, in Columbus, Muscogee County, Georgia. In addition, an extension to the Follow Me Multi-Use Trail would be constructed along an abandoned railroad bed and connect to Infantry Road (Figure 1).

Muscogee 2018
13257 Keith, Scot J. Phase I Archaeological Survey of Proposed Roundabout Construction for SR 124/Braselton Highway at CR 47/Old Hog Mountain Road

New South Associates, Inc. (New South), has completed a Phase I Archaeological Survey for proposed improvements to the intersection of SR 124/Braselton Highway and CR 47/Old Hog Mountain Road in Barrow County, Georgia.

Barrow 2018
13258 West, Shaun E. A Phase I Archaeological Survey for the 10th Street Bridge Project, Fulton County, Georgia

The proposed project, located in Midtown Atlanta, would involve “complete street” improvements across the 10th street (St) bridge and on the Techwood Drive (Dr) and Williams St connections with the bridge.

Fulton 2018
13259 Johnson, Eric Section 106 Review TCNS ID 174424 Proposed 250-Foot Self-Supporting Lattice Telecommunications Structure (270-Foot Overall Height Including Appurtenances)

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Camden 2018
13260 Crass, David C. Proposed 300-Foot Guyed-Type Telecommunications Structure

Environmental Corporation of America’s (ECA) client, Southern Communications Services, d/b/a Southern Linc Wireless c/o Value Concepts, Inc., is proposing to construct a telecommunications facility as described in the following FCC Form 620, New Tower (NT) Submission Packet.

Lincoln 2017
13261 Crass, David C. Proposed 250-Foot Self-Supporting Lattice Telecommunications Structure (270-Foot Overall Height Including Appurtenances

Environmental Corporation of America’s (ECA) client, Southern Communications Services, d/b/a Southern Linc c/o Value Concepts, Inc., is proposing to lease a 100-foot by 100-foot (30- meter by 30-meter) lease area for the construction of a telecommunications facility as described in the following

Gilmer 2018
13262 Keith, Scot J. Phase I Addendum Archaeological Survey of the Bells Mill Bridge Replacement, SR 11, Hall County

The proposed project would consist of the replacement of the two-lane bridge over the Chattahoochee River crossing Lake Lanier with a new two-lane bridge east of the existing bridge.

Hall 2017
13263 Carlock, Michael D. Widening and Reconstruction of SR 32 from West of CR 296 to the Western City Limit of Douglas in Coffee County: Fourth Addendum

The proposed project consists of widening and reconstruction of SR 32 from approximately 1,800 feet west of CR 296 eastward to the western city limit of Douglas in Coffee County, Georgia (Figure 1).

Coffee 2017
13264 Lane, Katherine, Beazley, Matthew Addendum to Section 106 Review TCNS ID 181041 Proposed 370-Foot Guyed-Type Telecommunications Structure (Overall Height Including Appurtenances)

Environmental Corporation of America (ECA) has completed an Archaeological Assessment for the federal undertaking at the subject site.

Mitchell 2019
13265 Young, Parker A. Section 106 Review TCNS ID 188790 Proposed 118-Foot Tall Monopole Telecommunications Structure (Overall Height Including Appurtenances)

Environmental Corporation of America was contracted by Pyramid Network Services, LLC on behalf of Motorola Services and Cherokee County to perform an archaeological assessment as part of the Section 106 Review process for a proposed telecommunications facility.

Cherokee 2019