Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
13510 Studstill, David E. Special Provisions for Construction Contract: BRF-153-1(17), Dooly County, Georgia

The following Special Provisions are required for the construction contract on the above referenced project and shall appear as a notation on plan sheets.

Dooly 1996
13511 Studstill, David E. Special Provisions for Construction Contract: PFH-50(1), Jasper County, Georgia

Project PFH-50(1), Jasper County is a proposal to replace five existing substandard bridge structures on County Road 141. However, this document addresses the effects to one NR eligible resource located at one of the five proposed bridge replacement locations.

Jasper 1998
13512 Bowen, William R. Archaeological Survey and Assessment of County Bridge Project BRO-0095(1), Dougherty County, District Four

Georgia DOT Project # BRO-0095(1) is an in-place bridge replacement project at Old Dawson Road at Kiokee Creek in Dougherty County, District 4 Because the project is in place, no new areas will be impacted.

Dougherty 1979
13513 Bowen, William R. Archaeological Survey and Assessment of County Project BRO-LB-279(3), Toombs County, District Five

Georgia DOT Project # BRO-LB-279(3) is an in-place bridge replacement project at Rocky Creek At Hardin Chapel road in Toombs County, District 5. Because the project is in place, no new areas will be impacted.

Toombs 1979
13514 Wilkerson, Joe D. Environmental Impact Statement Georgia Project F-026-2(43)C and F-007-4(20)C, Ware County

There are portions of the project alignment that have been cl eared environmentally under a separate document. One section is: Francis Street from Augusta Avenue easterly to the Waycross Urban Area Boundary, which is approximately 0.3 mile in length, and is known as F-002-1 (28), Ware County.

Ware 1980
13515 Bowen, William R. Archaeological Survey and Assessment of County Bridge Project BRO-0051(1), Chatham County

The survey entailed examination of relevant survey reports, project plans, maps, and site files, and a pedestrian (walk-through) survey of the entire project, occasionally complemented by periodic placement of subsurface tests where needed.

Chatham 1979
13516 Bowen, William R. Archaeological Survey and Assessment of County Bridge Project BRF-030-4(3), Bryan County

The survey entailed examination of relevant survey reports, project plans, maps, and site files, and a pedestrian (walk-through) survey of the entire project, occasionally complemented by periodic placement of subsurface tests where needed.

Bryan 1979
13517 Braley, Chad O. Archaeological Survey of County Bridge Project BRF-155-1(1), Houston and Twiggs Counties

Georgia DOT Project # BRF-155-1(1) is an in-place bridge replacement project at Savage Creek and SR 96 in Houston-Twiggs Counties, District 3. Because the project is in place, no new areas will be impacted.

Houston 1979
13518 Braley, Chad O. Archaeological Surveys of County Bridge Project BROLB-0139(1), Hall County

Georgia DOT Project # BROLB-0139(1) is an in-place bridge replacement project at Mulberry Creek and County Road 1297 (Union Road) in Hall County, District 1. Because the project is in place, no new areas will be impacted.

Hall 1979
13519 Braley, Chad O. Archaeological Survey of County Bridge Project BROLB-0139(2), Hall County

Georgia DOT Project # BROLB-0139(2) is an in-place bridge replacement project at Flat Creek and County Road 345 (Dixie Drive) in Hall County, District 1. Because the project is in place, no new areas will be impacted.

Hall 1979