Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
2598 Patton, Robert B. Peachtree Industrial Boulevard (PIB) Chamblee Tucker Rd Pedestrian Corridor Improvements

The proposed project would include the construction of a 5-foot ADA compliant sidewalk along the south side of PIB and the west side of Chamblee-Tucker Road.

DeKalb 2003
2599 Price, George D. Data Recovery Investigations at 9MF155, McDuffie County, Georgia

This report presents the results of a Phase III archaeological data recovery at 9MF155 that TRC conducted in June and July 2003. The site is located within the proposed Thomson Bypass corridor in McDuffie County, Georgia, north of Thomson (Figure 1).

McDuffie 2003
2600 Pietak, Lynn Marie Phase I Archaeological Survey of Two Intersection Improvements: State Route 125/Bemiss Road at County Road 784/Northside Deive and State Route 133/St. Augustine Rd at County Road 485/River Street, Lowndes County, Georgia

In August 2003, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed intersection improvements at two locations, State Route 125/Bemiss Road at Northside Drive and State Route 133/St. Augustine Road at River Street in Lowndes County, Georgia.

Lowndes 2003
2601 Joseph, Joseph W., Sheffield, Mason W. Phase I Archaeological Survey of the SR 15/Curry Creek Bridge Corridor

New South Associates conducted a Phase I archaeological survey of the proposed SRI 5/ Curry Creek Bridge corridor in the city of Jefferson in Jackson County Georgia.

Jackson 2003
2602 Rock, Carolyn, Cook, Fred C. Cultural Resource Impact Mitigation for Site 9MC367, Phase 3, Darien Georgia Waterfront

An intensive level archaeological survey was conducted at the Darien, Georgia Waterfront site, known as 9Mc367 "Phase 3,"prior to the construction of a commercial business facility on the property.

McIntosh 2003
2603 Webb, Robert S., Jordan, William R. Phase I Archeological Resources Survey of the Proposed I-75 and I-575 HOV Lane Construction Cherokee and Cobb Counties, Georgia

R. S. Webb & Associates (RSWA) conducted an archeological survey of the proposed Georgia Department of Transportation (GDOT) High Occupancy Vehicle (HOV) Lanes project [Project Nos.

Cherokee 2003
2604 Arhaeological Survey of Proposed Educational Area

None Present.

Camden 2003
2605 Webb, Robert S. Archeological Field Survey Proposed Eagle Drive Widening Project Cherokee County, Georgia

On July 13 and 14, 2003, Mr. Steve Webb, Principal Archeologist with R.S. Webb & Associates, conducted an archeological field survey of the proposed Eagle Drive widening project between Bells Ferry Road and just east of Putnam Ferry Road (Figure 1).

Cherokee 2003
2606 Pietak, Lynn Marie Phase I Archaeological Survey of Intersection Improvements at SR 5 Connector/Barrett Parkway with CR 6798/Cobb Place Blvd/Costco Dr, Cobb County, Georgia

In October 2003, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed intersection improvements at State Route (SR) 5 Connector/Barrett Parkway with CR 6798/Cobb Place Boulevard/Costco Drive in Cobb County, Georgia.

Cobb 2003
2607 Duff, Eric Anthony, Gardner, Jeffrey W. Archaeological Survey of the West Peachtree Street Livable Centers Initiative (LCI) Improvement Project, Atlanta (Fulton County), Georgia

The proposed project consists of approximately 5900 feet (1.12 miles) of streetscape and pedestrian improvements on West Peachtree Street in Midtown Atlanta between North Avenue and 14th Street.

Fulton 2003