Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
4208 Duff, Eric Anthony Archaeological Assessment of Project CSNHS-M003-00(788), Worth County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project CSNHS-M003-00(788), Worth County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (

Worth 2008
4209 Pietak, Lynn Marie Phase I Archaeological Survey of SR 81 at Racetrack Road, Henry County, Georgia

The proposed project would improve the intersection of SR 81 at Racetrack Road. The alignment of Racetrack Road would be shifted to the west to create a more desirable 84 degree intersection with SR 81, the current skew is 40 degrees.

Henry 2008
4210 Pietak, Lynn Marie Addendum to Ph. I Arch. Survey of Proposed ATMS Installation and Signal Upgrades

The proposed project includes the design of fiber optic communications cable, closed-circuit television (CCTV) cameras, Intersection Video Detections System (IVDS), microwave radar detectors, changeable message signs (CMS), and traffic signal upgrades.

Clayton 2008
4211 Pietak, Lynn Marie Ph. I Arch. Survey of the Proposed Improvements to SR 3/US 19, Upson County, Georgia

The proposed project is located in Thomaston, Georgia. The total project length is approximately 2.0 miles long. The existing roadway is an urban section with two lanes in each direction and a two-way left turn lane on the southern third of the project.

Upson 2008
4212 Pietak, Lynn Marie Archaeological Survey for the Redesign of the Columbus Regional Traffic Control Center

The proposed project would consist of the redesigning of the second floor interior of the Columbus Government Annex building located at 420 Tenth Street. The second floor of the existing building is being redesigned in order to accommodate a new Columbus Regional Traffic Control Center.

Muscogee 2008
4213 Price, George D. Phase I Archaeological Survey Sewerage System Improvements City of Twin City, Georgia

Greenhouse CONSULTANTS incorporated was retained by G. Ben Turnipseed Engineers on behalf of the city of Twin City, Georgia to undertake a Phase I archaeological survey of the proposed Sewerage System Improvements project area.

Emanuel 2006
4214 Pietak, Lynn Marie Adden. to Ph. I Arch. Sur. of the Marietta Blvd. at Bolton Rd. Int. Impr. Proj. Area, Fulton Co.

The proposed project would consist of the reconfiguration of the existing six-way intersection at Marietta Boulevard, Bolton Road, Adams Drive and Plant Road in Atlanta, Georgia.

Fulton 2008
4215 Jordan, William R. Fourth Addendum to an Archaeological Survey of the Proposed Lewis Road Improvements

Project Changes Since the Approved Environmental Document: Since the approval of the most recent Environmental Reevaluation dated October 3, 2007, the project has been revised to include design refinements.

Cobb 2008
4216 Smith, Patrick Addendum to Phase I Archaeological Survey of the Proposed North Avenue Intersection Improvements, Fulton County, Georgia

The purpose of this addendum is to address changes to the APE of the proposed project.

Fulton 2008
4217 Gale, Sara H. Archeological Survey of Project NH-IM-75-1(246), Bibb County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project NH-IM-75-1(246), Bibb County, has been surveyed with respect to archeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP

Bibb 2008