4188 Pappas, Andrew A. A Phase I Archaeological Resources Survey of the Post Office Drive Re-evaluation Tract

GDOT Project STP-165-1(60) would consist of the widening of Snapfinger Road from Flat Shoals Parkway to Wesley Chapel Road in southwestern DeKalb County, Georgia. This report is an addendum to two previous reports.

DeKalb 2007
4189 Pietak, Lynn Marie Ph. I Arch. Survey of SR 135 Douglas Bypass Widening, Coffee County, Georgia

The proposed project would consist of the widening of the SR 135 bypass corridor from a two-lane roadway (one travel lane in each direction) to a four-lane roadway (two travel lanes in each direction) on the south side of Douglas, Coffee County.

Coffee 2007
4190 Pietak, Lynn Marie Adden. to I-85 at Lawrenceville-Suwanee Rd. Lands. & Sidewalk Proj., Gwinnett Co., GA

Original: The proposed project would construct sidewalks the along the west side of Lawrenceville-Suwanee Road from Satellite Boulevard to Old Peachtree Road. The project would also construct pedestrian facilities along both sides of the roadway.

Gwinnett 2007
4191 Pietak, Lynn Marie Phase I Archaeological Survey of SR 40 from Folkston to Milepost 2.54

This project is one of several projects on SR 40 Okefenokee Parkway between Folkston (Charlton County) and Kingsland (Camden County). This project begins on the north side of Folkston at the intersection of SR- 15/US-I with Indian Trail/ US-301 Connector.

Charlton 2007
4192 Pritchard, James C. Intensive Archaeological Survey of the Proposed Creighton Road Tract Development, Cherokee County, Georgia

A Phase I intensive archaeological survey was carried out for the proposed Creighton Road Tract development in Cherokee County, Georgia. The proposed development is slated as residential.

Cherokee 2006
4193 Pietak, Lynn Marie Phase I Archaeology Survey of SR 185 over Joaquin Creek Bridge Replacement

Project CSBRG-0007-00(162) is a bridge replacement project in Charlton County 2.5 miles south of Junction with SR 94 on SR 185 over Joaquin Creek. The total project length is approximately 2,200 feet (0.416 mile), beginning at M.P. 10.29 and extending to M.P. 10.71.

Charlton 2007
4194 Pappas, Andrew A. Phase I Archaeological Survey of the 3.35-Acre Potential Boat Ramp/Picnic Area for the McGinnis Ferry Road Bridge Replacement over the Chattahoochee River

GDOT Project STP-2564(4) would consist of the replacement of the existing bridge on McGinnis Ferry over the Chattahoocee River; the current survey is a reevaluation addressing the development of an additional 3.35-acre parcel as a boat ramp and picnic area.

Forsyth 2007
4195 Gresham, Thomas H. Archaeological Survey of the Proposed Hartley Bridge Road 115 Transmission Line and Hartley Bridge Road 115/25/12 kV Substation, Bibb County, Georgia

This report presents the results of an intensive archeological survey performed by Southeastern Archeological Services, Inc.

Bibb 2007
4196 Braley, Chad O. Archaeological Survey of the Proposed Villa Rica-Fairplay Junction 115 kV Transmission Line and Post Road 115 kV Switching Station, Douglas County, Georgia

In November of 2006, Southeastern Archeological Services, Inc. (SAS) conducted a Phase I archeological survey of approximately 6.1 km (3.8 mi) of a proposed 115 kV transmission line corridor and 4.4 ha (11 ac) of a switching station tract in northwestern Douglas County, Georgia.

Douglas 2006
4197 Braley, Chad O. Archaeological Survey of the Proposed Jackson Creek 230/25 kV Substation, Rockdale County, Georgia

In November of 2006 Southeastern Archeological Services, Inc. conducted an archeological survey for the proposed 11 acre 230/25 kV Jackson Creek Substation in Rockdale County. The tract was entirely wooded so shovel testing was the primary survey method.

Rockdale 2006