Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
7504 Pomfret, James Phase I Archaeological Survey of Hall County Safe Routes to School

This project is a Safe Routes to School (SRTS) infrastructure project that will improve pedestrian and bicycling accessibility for students within a 2-mile radius of Centennial Elementary School, New Holland Elementary School, Fair Street Elementary School, Enota Elementary School, and Gainesvil

Troup 1996
7505 Duff, Eric Anthony Archaeological Assessment of Project SAMA-24 (103), Putnam County

In compliance with Section 10 6 of the National Historic Preservation Act of 1966 and amendments thereto, project SAMA-24 (103), Putnam County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NR

Heard 1995
7506 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of Chattahoochee Safe Routes to School, Chattahoochee County, Georgia

This addendum includes work for the following change only: sidewalk will be constructed on the eastern side of Broad Street for approximately 425 feet from Michelle Circle Street to north of Sandy Street A curb extension and gutter will be constructed at the intersection of Broad Street/SR 520 a

Columbia 2004
7507 O'Steen, Lisa Diane, Ledbetter, Jerald Archaeological Investigations at the Gertrude Shell Midden Site, 9BK14, Burke County, Georgia.

This study was proposed and funded by the Georgia Council on American Indian Concerns in coordination with State Archaeologist, Dr. David Crass, and the Historic Preservation Division of the Georgia Department of Natural Resources.

Chatham 2013
7508 Quirk, Phillip W. Addendum to Phase I Archaeological Survey of the Proposed Improvements to Jimmy DeLoach Parkway at US 80

The Jimmy DeLoach Parkway Phase II (P.I. 522790) and the Jimmy Deloach Parkway at U.S. 80 Interchange {0007259) project designs are interconnected, and have an approximately 3,750 foot overlap between U.S. 80 and the CSX Railroad crossing.

Effingham 2013
7509 Baughman, Pamela J. Safe Routes to School, Newnan Crossing Elementary

The proposed project would consist of the construction of a 5-foot sidewalk along the south side of Lower Fayetteville Road from Belltree Circle to the east school drive. A total of four ADA ramps and domes are proposed at Belltree Circle and at both school drives.

Clarke 2005
7510 Baughman, Pamela J. Safe Routes to Schools (SRTS) at Love Nolan, Sandtown Middle, and Seaborn Lee Elementary

This project consists of pedestrian and bicycle infrastructure improvements in south Fulton County in the vicinity of Love T. Nolan Elementary, Sandtown Middle, and Seaborn Lee Elementary.

Floyd 2005
7511 Ledbetter, Jerald, Gresham, Thomas H. Archaeological Survey of the Proposed Dresden-Heard County 500 kV Transmission Line Coweta and Heard Counties, Georgia

This report presents the results of an intensive archeological survey conducted by Southeastern Archeological Services, Inc. in central Heard and Coweta Counties Georgia, where the Georgia Transmission Corporation (GTC) wishes to construct a 6.9 mi (11.1 km) 500 kV transmission line.

Muscogee 2005
7512 Botwick, Brad Phase I Archaeological Survey of a Proposed Bus Shelter, City of Dalton, Whitfield County

The proposed project would consist of the construction of a bus shelter with up to twelve bus bays to service the Whitfield County Transit Service. The project would be constructed at 130 Gillespie Drive, southeast of the City of Dalton in southern Whitfield County.

Tift 2005
7513 Gale, Sara H. Improve drainage along SR 23 and SR 4 in Folkston

The proposed project would consist of improvements to existing drainage systems and structures along SR 23 and SR 4 in Folkston (see attached location map).

Harris 2000